Similar Projects
Reported | 05/19/2022 12:00 AM |
Project Title | Street Improvements |
Physical Address | View project details and contacts |
City, State (County) | Mount Vernon, IN (Posey County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Asphalt Paving, As Follows: a. Main St. 6th St. To East Lincoln Ave. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 2.0" Depth & Cleaning 10,334 Syd Patching 4.0" Hma 25.0 Mm Base 92 Ton Tack Furnish & Apply 720 Gal Hma Surface 2.0" Hma 9.5 Mm Surface Type c 1,140 Ton Striping 4" Double Yellow Center Stripe 6,200 Lft Rr Crossing White Thermoplastic Pavement Marking 2 Each b. Southwind Ave. Grenada St. To Allyn Dr. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5" Depth & Cleaning 3,827 Syd Patching 4.0" Hma 25.0 Mm Base 31 Ton Tack Furnish & Apply 240 Gal Hma Surface 1.5" Hma 9.5 Mm Surface Type b 290 Ton Stop Bars White Paint Pavement Marking - 24" Wide 2 Each c. Roosevelt Dr. Main St. To Allyn Dr. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5" Depth & Cleaning 10,110 Syd Patching 4.0" Hma 25.0 Mm Base 90 Ton Tack Liquid Tack Adhesive 710 Gal Hma Surface 1.5" Depth, 9.5 Mm Surface Type b 860 Ton Stop Bars White Paint Pavement Marking 24 Wide 4 Each d. Westwood Dr. Lower New Harmony Rd. To Dead End Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5 Depth & Cleaning 3,844 Syd Patching 4.0 Hma 25.0 Mm Base 34 Ton Tack Liquid Tack Adhesive 270 Gal Hma Surface 1.5 Depth 9.5 Mm Surface Type b 327 Ton Stop Bars White Paint Pavement Marking 24 Wide 1 Each e. Melody Ln. Westwood Dr. To Dead End Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5 Depth & Cleaning 1,335 Syd Patching 4.0 Hma 25.0 m Base 14 Ton Tack Furnish & Apply 100 Gal Hma Surface 1.5 Hma 9.5 Mm Surface Type b 114 Ton Stop Bars White Paint Pavement Marking 24 Wide 3 Each f. Sunset Dr. Allyn Dr. To Dead End Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5 Depth & Cleaning 591 Syd Patching 4.0 Hma 25.0 Mm Base 8 Ton Tack Furnish & Apply 50 Gal Hma Surface 1.5 Hma 9.5 Mm Surface Type b 51 Ton Stop Bars White Paint Pavement Marking - 24" Wide 1 Each g. Cardinal Dr. Tile Factory Rd. To Dead End Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5 Depth & Cleaning 6,961 Syd Patching 4.0 Hma 25.0 Mm Base 62 Ton Tack Furnish & Apply 490 Gal Hma Surface 1.5 Hma 9.5 Mm Surface Type b 592 Ton Stop Bars White Paint Pavement Marking 24 Wide 1 Each h. Mockingbird Ln. Tile Factory Rd. To Dead End Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5 Depth & Cleaning 4,533 Syd Patching 4.0 Hma 25.0 Mm Base 40 Ton Tack Furnish & Apply 320 Gal Hma Surface 1.5 Hma 9.5 Mm Surface Type b 386 Ton Stop Bars White Paint Pavement Marking 24 Wide 1 Each i. Robin Ln. Cardinal Dr. To Mockingbird Ln. Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5" Depth & Cleaning 1,568 Syd Patching 4.0 Hma 25.0 Mm Base 14 Ton Tack Furnish & Apply 110 Gal Hma Surface 1.5 Hma 9.5 Mm Surface Type b 134 Ton Stop Bars White Paint Pavement Marking - 24 Wide 2 Each j. Lark Ln. Dead End To Dead End Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5 Depth & Cleaning 2,940 Syd Patching 4.0 Hma 25.0 Mm Base 26 Ton Tack Furnish & Apply 210 Gal Hma Surface 1.5 Hma 9.5 Mm Surface Type b 250 Ton Stop Bars White Paint Pavement Marking - 24 Wide 2 Each k. Oriole Circle Cul-De-Sac To Cul-De-Sac Qty. Unit Mobilization Includes Traffic Control 1 Each Milling Mill 1.5" Depth & Cleaning 4,280 Syd Patching 4.0" Hma 25.0 Mm Base 38 Ton Tack Furnish & Apply 300 Gal Hma Surface 1.5" Hma 9.5 Mm Surface Type b 364 Ton Stop Bars White Paint Pavement Marking - 24" Wide 2 Each Summary Of Quantities Qty Unit Mobilization & Traffic Control 11 Each Milling-Full Width & Cleaning 1.5" 39,989 Sy Milling-Full Width & Cleaning 2.0" 10,334 Sy Hma Patching - 4" 449 Ton Liquid Tack 3,520 Gal Hma Surface 2.0 Type c 1,140 Ton Hma Surface 1.5 Type b 3,362 Ton Stop Bars-Pavement Marking 24 Wide 14 Each Striping-4" Double Yellow Stripe 6,200 Lft Rr Crossing-Thermo Pavement Markings 2 Each (Includes 3 Stop Bars, 2 Rs & x) |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |