Similar Projects
Union Springs CSD 2019 Capital Improvement Project Phase 4
Renovation
Results
Union Springs, NY 13160

Port Byron CSD 2021-2022 Capital Outlay Project
Infrastructure, Alteration
Post-Bid
Port Byron, NY 13140

Weedsport CSD 2022 Capital Project - Phase 1
Renovation
Post-Bid
Weedsport, NY 13166

Radiation Treatment Center at Auburn Community Hospital
New Construction, Infrastructure - 12,000 SF
Pending Verification
$14,400,000 CJ est. value
Auburn, NY 13021

Removal of Sediment From North Brook
Infrastructure
Post-Bid
$125,000 CJ est. value
Weedsport, NY 13166

Riverforest Road East Abutment Repair
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Brutus, NY 13166

Cayuga Watercourse - New York Power Authority (NYPA)
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Cayuga, NY 13034

Cayuga County Office Building Project
New Construction, Infrastructure
Post-Bid
$1,800,000 CJ est. value
Auburn, NY 13021

Franklin Street Service Main Replacement - City of Auburn
Infrastructure
Conception
$660,000 CJ est. value
Auburn, NY 13021

Auburn Drug and Alcohol Treatment Court Expansion Services
Addition, Demolition, Infrastructure
Post-Bid
Auburn, NY 13021

Lake Avenue Pavement Preservation Project - City of Auburn
Infrastructure
Conception
$3,638,000 CJ est. value
Auburn, NY 13021

Annual Fire Insepction 2022-2023
Term Contract
Design
Auburn, NY 13021

2022-2023 Capital Outlay Exception Project
Renovation
Results
$75,450 CJ est. value
Port Byron, NY 13140

Town of Sennett Water District No. 3
Infrastructure
Results
$5,218,411 CJ est. value
Sennett, NY 13021

Striping
Infrastructure
Bidding
$400,000 CJ est. value
Auburn, NY 13021

Last Updated 01/27/2023 01:11 PM
Project Title

2019-2023 Capital Improvement Project Phase 1D Auburn High School - General Constuction

Physical Address View project details and contacts
City, State (County) Auburn, NY 13021   (Cayuga County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Building: NYSED Control No: Auburn High School (AHS) 05-01-00-01-0-015-033 Auburn High School (AHS) 05-01-00-01-0-015-034 Abbreviated/Alternate Project Names. Project may also be referred to as: 2019-2023 Capital Improvement Project - Phase 1D1 & 2 AHS Combined Phase 1D1 & 2 AHS Combined Phase 1D1 & 2 Project consists of reconstruction of HVAC infrastructure throughout Auburn High School - primarily replacement/upgrade of dual temperature branch piping lines serving existing Unit Ventilators and Fan Coil Units - including associated and ancillary construction. Project includes remediation of hazardous materials. Project includes partitions and finishes. Project includes electrical and controls work. Construction Contract: Bids will be received for the following Work: Multiple Contract Project consisting of the following prime contracts: General Building Construction. Hazardous Materials Abatement Contract. Mechanical Construction. Electrical Construction. Deliveries of bids shall be placed in a designated labeled container within the vestibule of the buildings main entrance. Bid security shall be submitted with each bid in the amount of five percent of the bid amount, in the form of a Bid Bond, Certified Check, or Cashiers Check payable to the Owner. No bids may be modified or withdrawn for a period of forty-five calendar days after opening of bids. Bid addenda will be published as needed to provide clarification/response to questions. Any Non-Bidder so returning documents will be refunded fifty percent of their deposit. Shipping (Non-refundable) If bidder requires that set(s) of documents be delivered, additional shipping charge of $25.00 will apply unless a shipping account number is provided. Contract award shall be subject to the condition that the applicable plans and specifications for the work to be done shall be approved by the Commissioner of Education. The contract(s) may require the performance of design services for certain ancillary elements of the project to be by a New York State licensed and registered architect or professional engineer, landscape architect, or land surveyor. Attention of the bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract, as well as to other provisions set forth in the Instructions to Bidders. The Owner hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the Auburn Enlarged City School District. The awarding of the Contract(s) will be subject to the approval of the New York State Education Department. Successful bidder shall begin and continuously and diligently prosecute the Work on receipt of the Notice to Proceed and shall achieve Substantial Completion for the Work within the Contract Time(s) provided in the documents. Owner reserves the right to reject any and all bids and to waive informalities and irregularities.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents