Similar Projects
Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Cuba City School District 2022 Bond - Elementary and High School
Addition, Demolition, Renovation, Infrastructure
Design
$36,000,000 CJ est. value
Cuba City, WI 53807

Dickeyville - Lancaster Const / Passing Lanes and Slopes / Misc
Infrastructure
Design
$7,000,000 CJ est. value
Lancaster, WI 53813

Snowplowing Bids
Infrastructure
Post-Bid
Muscoda, WI

Snow Plowing Bids
Infrastructure
Post-Bid
Muscoda, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Scot Substation Earthwork
Infrastructure
Results
Muscoda, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

Chip Sealing, Asphalt, Wedging Bridge Sealant
Term Contract
Post-Bid
Beetown, WI

Spruce Park Drive Utility and Street Extension
Infrastructure
Results
Potosi, WI

Red Barn Wind Farm
Infrastructure
Construction
$162,000,000 CJ est. value
Wingville, WI 53569

Last Updated 03/24/2023 09:14 AM
Project Title

Water Resource Recovery Facility Electrical Upgrade Project

Physical Address View project details and contacts
City, State (County) Platteville, WI 53818   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,492,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Provide replacement of electric utility service, stand-by power generator, process electrical power gear and power management controls. Project will include the removal of the existing standby generator and all related appurtenances. Electrical gear scheduled for maintenance replacement under this project includes the following: existing 1200-amp Main Service Disconnect, Switch Boards, automatic transfer switch, standby power generator, lighting panels and control upgrades. Removal of existing generator and diesel storage tank. Additional electrical work, architectural, HVAC, site grading, erosion control, site concrete, paving, site restoration, and plumbing work is included in the project. The project is being bid with Bid A Schedule and Bid B Schedule: The anticipated Bid A substantial completion date is August 23, 2024 and final completion date is October 31, 2024. The anticipated Bid B substantial completion date is August 24, 2023 and final completion date is November 2, 2023. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at http://water.epa.gov/grants_funding/ aisrequirement.cfm . OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents