Similar Projects
Armor Joint Repairs and Joint Sealing on Various Roads and Bridges, Precinct 3
Results
Houston, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

Harvest Townside Phase 2 Paving
Results
TX

Harvest Townside Phase 2 Mass Grading
Results
TX

Southern Region Disaster Recovery Support BPA
Results

Last Updated 04/08/2021 05:01 PM
Project Title

East Loop Ph IV FM 51 to Northbend

Physical Address View project details and contacts
City, State (County) Weatherford, TX   (Parker County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.75 miles of 2-lane roadway consisting of 0.47 mile urban concrete roadway, 1.28 2-lane with asphalt shoulders and one 400-foot four-span bridge for the construction of Eastern Loop Phase IV.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents