Similar Projects
Operations of Water/Wastewater Treatment Facilities and Lift Station
Post-Bid
Mercedes, TX 78578

Replacement of a Lift Station and Force Main
Post-Bid
Wake Village, TX 75501

Lift Station System Replacement
Results
Irving, TX 75062

Construction of Bridgeland Irrigation Pump Station No. 5
Results
Less than $1,378,477 est. value
TX

North 2 (11.8 MGD) Pump Station
Construction
$4,572,090 to $5,207,102 est. value
El Paso, TX 79925

Ard Road Pump Station Upgrades Contract 1
Post-Bid
$150,000 est. value
Seagoville, TX 75159

Lift Station Improvements for Aspen Meadows
Results
TX

Pump Station 3 Site Improvements
Post-Bid
$4,000,000 to $6,000,000 est. value
TX 78746

Banquete Booster Pump Station Cyndie Park II TWDB Project
Results
Banquete, TX

KOA Lift Station
Post-Bid
$650,000 to $680,000 est. value
Montgomery, TX 77356

Construction Management Services
Results
Arlington, TX

Community ISD Lift Station Upgrades
Post-Bid
Nevada, TX 75173

Lift Station Improvements for Verandah Master Infrastructure
Results
TX

Existing Lift Station No. 1 Electrical Modification, Generator, and Motor Control Center Replacement
Post-Bid
TX

42" Gravity Outfall Twin Lakes Boulevard
Results
TX

Last Updated 05/11/2021 08:47 AM
Project Title

Leon Creek WRC Improvements and Upgrades Phase 2

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78224   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $18,143,916
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Project, in general terms, consists of construction of the Leon Creek Water Recycling Center (WRC) Improvements and Upgrades Phase 2. 1). Removal and replacement of existing grit removal equipment at the Leon Creek WRC and replacement of the two existing headworks electrical buildings with a new electrical building. 2). Provide isolation valves and adjust fire hydrants on the Leon Creek WRC’s non-potable water system. 3). Provide structural and safety repairs to the Leon Creek WRC Flow Equalization Basins (FEBs). 4). Provide a new chlorine injection point at the Leon Creek WRC Filter Backwash Pump Station. 5). Address safety and corrosion issues at the Leon Creek WRC at the Flow Equalization Basin (FEB) Diversion Structure, Headworks, Primary Clarifiers, Common Effluent Channel at the Aeration Basins, and Storm Shelter. 6). Address safety and corrosion issues at the Salado Creek WRC. 7). Install two cloth media filters, replace existing level sensors and festooned cables and update existing control panels for the existing cloth media filters, replace butterfly gates in the eight filter influent channels, replace the existing MCC, and replace the existing radio communications system with fiber optic at the Leon Creek WRC Tertiary Filtration Facility and Backwash Pump Station. 8). Demolish abandoned facilities, process units, and equipment at the Leon Creek WRC, including digesters and associated electrical building and boiler and pump buildings, storm water clarifier, belt filter press area, dissolved air flotation thickener chemical facilities, wet well at the aeration control building, blower facility for the FEBs, pump station near the headworks, and odorous air facility. 9). Replace site paving at the Leon Creek WRC. 10). Install level sensor and alarm panel at the existing chlorine injection vault for the RAS Pump Station No. 1 system.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents