Similar Projects
HVAC/MEP for Installs, Repair, and Maintenance
Alteration
Bidding
Houston, TX

HVAC Preventative Maintenance Service
Term Contract
Bidding
Dallas, El Paso, Houston, San Antonio, TX 75243

HVAC Equipment, Installation, Service and Related Products
Post-Bid
Houston, TX 77092

Redundant Chiller Package at the KIPP SW Campus
Post-Bid
Houston, TX 77099

Chiller Replacement Project
Results
Houston, TX 77000

HVAC Replacement
Results
Houston, TX

Air Cooled Chiller for FMC Carswell
Term Contract
Bidding
Fort Worth, TX 76127

N045--Replace Domestic Hot Water Heater B100 (Va-20-00040229)
Post-Bid
Houston, TX 77030

Replacement and Installation of Heating, Ventilation and Air Conditioning System at the Youth Village
Results
Less than $600,000 est. value
Seabrook, TX 77586

H999--Michael E. DeBakey VA Medical Center (MEDVAMC) Clinical and Research Hood Certification Services
Post-Bid
Houston, TX

HVAC Maintenance at San Jacinto Battleground State Historic Site
Term Contract
Results
Less than $2,725 est. value
La Porte, TX 77571

S201--36C256-20-Q-0587 HVAC Duct and Hood Cleaning 580-20-1-5161-0002
Term Contract
Post-Bid
Houston, TX 77030

HVAC and Plumbing Maintenance
Results
Houston, TX 77033

HVAC Equipment, Installation, Service, & Related Products
Post-Bid
Houston, TX 79601

Kashmere Multi-Service Center HVAC Improvements
Results
$402,000 est. value
Houston, TX 77026

Last Updated 09/21/2021 08:29 AM
Project Title

Arbor Building Air Handling Unit Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $444,665
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project involves all labor, equipment, materials, and supplies required for replacement of five (5) roof top air handling units in the Arbor Building. This includes the chilled water and hot water control valves and actuators and all Siemens temp sensors, static pressure switchs, dampers, actuators and other existing controls. All controls to be connected to existing BAS system. Replace Exhaust Fan Model D18-CCW-TH and Supply fan model FX18BH on Arbor North. Also, all Siemens BAS controls for each unit. Substantial Completion of the Project shall occur on or before December 31 2021.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents