Similar Projects
Deep Well Transmission Main
New Construction
Post-Bid
Hope Hull, AL 36043

Gaineswood Waterline Project
Post-Bid
Tuscaloosa, AL

US 231 - US 411 Water Relocation
Results
Less than $148,476 est. value
Odenville, AL

Canal Road Widening Water Main Relocation (Phase 1)
Results
Orange Beach, AL

Water System Rehabilitation and Upgrades
Post-Bid
Silverhill, AL 36576

2019 Subbasin 3 Sanitary Sewer Repairs
Results
Less than $208,290 est. value
Tuskegee, AL

Tin Mill Sanitary Sewer Replacement
Post-Bid
Less than $3,500,000 est. value
Birmingham, AL

2018 CDBG Contract B - Water System Improvements
Results
Less than $96,125 est. value
Detroit, AL

Morgan Road Widening
Post-Bid
Birmingham, AL 35222

Install Sampling Stations
Results
Birmingham, AL 35222

Construction of the Southeastern Area Water Transmission Main
Post-Bid
Anniston, AL 36202

2018 Neighborhood Improvements
Results
Haleyville, AL 35565

Furnace Hill and Tuscumbia Landing Water Line and Sanitary Sewer Extension
Post-Bid
Sheffield, AL

Annual Contract for Directional Drilling
Term Contract
Results
Less than $1,000,000 est. value
Theodore, AL

Utilities Improvements
Post-Bid
Decatur, AL 35609

Reported 12/11/2019 12:00 AM
Project Title

Shorter Sewer and Water Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Shorter, AL 36075   (Macon County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of approximately 5,100 linear feet of 12-inch water main and related appurtenances, including a 24-inch cased bore under I-85. The project also includes the installation of a sanitary sewer lift station, approximately 3,200 LF of 4” sanitary sewer force main, and related appurtenances, in Shorter, AL.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents