Similar Projects
Goshen Junior High School - Boiler and Pump Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Goshen, IN 46526

Plumbing Services at the James Hunter Building
Alteration
Post-Bid
East Chicago, IN 46312

Plumbing, Mechanical, Electrical Work for the New Mt. Vernon Elementary School
Alteration
Post-Bid
Fortville, IN

Huntertown Elementary School Plumbing
Alteration
Results
$215,000 est. value
Huntertown, IN 46748

Plumbing Repair
Alteration
Results
Nashville, IN

Park Road and 200 West Water Main
Infrastructure
Construction
$371,319 CJ est. value
Greensburg, IN 47240

Fawn River Crossing - Water Tower Coating System
Renovation
Post-Bid
$430,000 CJ est. value
Lagrange, IN 46761

Mount Vernon Transportation Center MEP
Alteration
Results
IN

Hegewisch Burnham Diamonds
Term Contract
Post-Bid
South Bend, IN 46601

Rehabilitation and Repainting of the Dubois Co. 4-H/Park Existing 200,000 Gallon Elevated Water Storage Tank
Infrastructure
Results
$135,200 CJ est. value
Saint Anthony, IN 47575

Levan Scott Academy Bid Phase 2: Architectural and MEP
Alteration
Post-Bid
$1,600,000 est. value
Fort Wayne, IN 46806

Wastewater System Improvements Division II - Repainting of Wastewater Treatment Plant Clarifiers and Miscellaneous Equipment - Rebid
Renovation
Results
$149,022 CJ est. value
Dale, IN 47523

On Call Plumbing Repairs
Term Contract
Post-Bid
Evansville, IN 47710

Water System Improvements Division II - Distribution Main Reinforcements Washington Township Water Corporation
Infrastructure
Results
$132,520 CJ est. value
New Washington, IN 47162

Indianapolis Public Schools Building 56 Plumbing
Renovation
Post-Bid
$300,000 CJ est. value
Indianapolis, IN 46204

Last Updated 04/25/2023 03:03 PM
Project Title

2022-1 CCMG Street And Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Dale, IN 47523   (Spencer County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $231,325 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of:1. Dunn Street: From Oak St. to Medcalf St./S.R. 62 Approx. 1,130 L.F. of Milling, Resurfacing, Sidewalk and Stormwater Infrastructure 2. Oak Street: From Dunn St. to Wallace St. Approx. 1,030 L.F. of Milling and Resurfacing 3. Walnut Street: From Brown Ave. to Medcalf St./S.R. 62 Approx. 2,320 L.F. of Milling and Resurfacing 4. Conner Court: From N. Washington St. to End Approx. 305 L.F. of Milling and Resurfacing 5. Main Street: From Vine St. to Medcalf St./S.R. 62 Approx. 785 L.F. of Milling and Resurfacing 6. Short Street: From Washington St. to Linwood St. Approx. 885 L.F. of Milling and Resurfacing 7. C.R. 305 E.: From Medcalf St./ S.R. 62 to End Approx. 530 L.F. of Milling and Resurfacing. A pre-bid conference will not be held for the project, but questions can be directed to croos@midwesterneng.com.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents