Similar Projects
Existing Township Hall Remodel
Renovation
Conception
Saugatuck, MI

Renovation - City Clerk Department - FAC036 - City of Novi
Renovation
Conception
$250,000 est. value
Novi, MI

14-B District Court & Ypsilanti Township Civic Center
Renovation
Design
Ypsilanti, MI 48197

Township Hall Cleaning Services
Term Contract
Design
Fowlerville, MI 48836

Ingham County Courthouse and Hilliard Building Improvements
Renovation
Bidding
$110,500 CJ est. value
Mason, MI 48854

Solar and Energy Storage Installations for City Sites
Renovation, Infrastructure
Bidding
$140,000 CJ est. value
Ann Arbor, MI 48104

Court Bathroom Remodel
Renovation
Post-Bid
Sandusky, MI

31st District Court Renovation
Renovation
Post-Bid
Hamtramck, MI 48212

Dexter City Hall - New Elevator
New Construction
Results
Dexter, MI 48130

City Hall Renovations
Renovation
Results
Dexter, MI 48130

Ottawa County Family Justice Center
Renovation
Construction
$200,000 CJ est. value
West Olive, MI 49460

City Hall 1st Floor Renovations - Phase 1
Renovation
Construction
$115,511 CJ est. value
Midland, MI 48640

Civic Center - White Lake Township
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
White Lake, MI 48386

City Hall Outside Brick Masonry Upkeep and Repair - City of Battle Creek
Renovation
Conception
$215,000 CJ est. value
Battle Creek, MI 49014

City Hall & 54A District Court Project
Renovation
Post-Bid
Lansing, MI 48951

Last Updated 03/23/2023 03:28 PM
Project Title

Guy C Larcom Municipal Building: HVAC Modernization - MF-CB-21-01 - City of Ann Arbor

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48104   (Washtenaw County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace aging HVAC controls serving floors 2-5. The project is included in the City of Ann Arbor's 2024-2029 Capital Improvement Program (CIP). As of March 23, 2023, information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents