Similar Projects
Package 2 Enterprise High School Synthetic Field Turf
Post-Bid
Enterprise, AL 36330

Pinedale Elementary School - Erosion Control Enterprise City Schools
Infrastructure
Post-Bid
Enterprise, AL 36330

Southern Region Disaster Recovery Support BPA
Results

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Sidewalk Removal and Replacement Project
Infrastructure
Post-Bid
Enterprise, AL

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-27 from the Junction of SR-12 in Enterprise to the Dale County Line
Results
$2,601,440 to $3,179,537 est. value
AL

Constructing the Intersection Safety Improvements (Intersection Conversion, Modifying Vertical and Horizontal Curves) on SR-134 at the intersection of CR-460 and CR-461 east of Opp
Infrastructure
Post-Bid
$905,995 to $1,107,327 est. value
AL

Constructing the Preventative Maintenance (Micro-Milling, Resurfacing, and Traffic Stripe) on SR-51 from the Junction of SR-12 (US-84) to the Junction of SR-167 Northeast of New Brockton
Results
$758,503 to $927,060 est. value
AL

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-88 from the Junction of SR- 12 (US-84) to the Junction SR-167 in Enterprise (Site 1) and on SR-134 from the Junction of SR-88 to the Junction of SR-12 (US-84) in Enterprise (Site 2)
Infrastructure
Post-Bid
$1,630,951 to $1,993,385 est. value
AL

Constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-302 (West McKinnon Street) from the junction of SR-12 (US-84)
Results
$820,167 to $1,002,427 est. value
New Brockton, AL

Service Center Bus Parking Paving Project
Infrastructure
Post-Bid
Enterprise, AL 36330

Constructing the Intersection Improvements on CR-239 and CR-114 to intersect SR-167 south of New Brockton.
Results
$995,477 to $1,216,694 est. value
New Brockton, AL

Site Improvements at Pinedale, Holly Hill Elementary Schools and Dauphin Junior High School
Infrastructure
Post-Bid
Enterprise, AL 36330

Simmons Street Drainage Replacement
Results
Less than $180,000 est. value
Elba, AL 36323

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-167 from the Junction of SR-12 (US-84/Boll Weevil Circle)
Results
$3,199,890 to $3,910,977 est. value
Enterprise, AL 36330

Reported 04/15/2022 12:00 AM
Project Title

Resurfacing and Erosion Repairs

Physical Address View project details and contacts
City, State (County) Elba, AL   (Coffee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Principal items of work include the resurfacing of parking lots and entrance roads along with miscellaneous concrete sidewalk replacement and erosion slope repair.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents