Similar Projects
Fore Acres First Addition Road Improvement Project
Infrastructure
Bidding
$415,000 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

SE 47th Avenue Resurfacing (from CR 42 to CR 484)
Infrastructure
Post-Bid
$1,042,000 est. value
Ocala, FL 34471

2020 Silver Springs Shores Resurfacing Project
Results
Less than $1,050,000 est. value
FL

Rainbow Park Units 1 and 2 Road Grading FY 20/21
Term Contract
Results
Less than $75,000 est. value
Ocala, FL 34471

NW 165th Court Road Roadway Improvement Project
Results
Less than $275,000 est. value
Ocala, FL 34471

Leonardo Estates NE 52nd Roadway Improvement Project
Results
Less than $110,000 est. value
Ocala, FL 34471

2020 Lake Tropicana Road Improvement Project
Results
Less than $150,000 est. value
Ocala, FL 34471

Resurfacing/Drainage Improvements
Results
Less than $18,229,319 est. value
FL

19/20 Road Overlay Projects - Phase II
Results
Less than $1,126,400 est. value
FL

Emergency Roadside Assistance Services (I-75)
Results

CR 314 Resurfacing (SR 40 to NE 52nd Place Road)
Results
Less than $1,584,000 est. value
Ocala, FL 34471

Design Build Push Button Contract No. 2 - Program Management
Results

NFSR 09-20.5 Road Construction
Results
$25,000 to $100,000 est. value
Silver Springs, FL 34488

NFSR 29-0.0 Road Construction Project
Results
$500,000 to $1,000,000 est. value
Silver Springs, FL 34488

Last Updated 10/08/2021 08:18 AM
Project Title

21B-210 SE 59th Street Resurfacing (South Magnolia Avenue to South Pine Avenue)

Physical Address View project details and contacts
City, State (County) Ocala, FL 34483   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $794,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a resurfacing project for SE 59th St, from South Magnolia Avenue/CR 475 to S. Pine Ave/US 441/301. Generally, the work includes: 1. Overlaying the existing pavement 2. Constructing side street and driveway aprons 3. Adding cross drain end treatments 4. Sodding shoulders 5. Restriping the pavement markings

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents