Similar Projects
Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Mount Diablo Boulevard Multi-Use Development
New Construction, Infrastructure - 4,300 SF
Design
$10,000,000 CJ est. value
Lafayette, CA 94549

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Crow Canyon Road Widening Project
Infrastructure
Results
$10,400,000 est. value
San Ramon, CA 94583

Hilton Garden Inn / Walnut Creek
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Walnut Creek, CA 94596

Hilton Garden Inn / Walnut Creek
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

AutoZone #3343 / Pittsburg
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Pittsburg, CA 94565

2022 Pavement Maintenance
Infrastructure
Post-Bid
$400,000 est. value
Diablo, CA

Last Updated 05/12/2023 10:35 AM
Project Title

FY 22-23 Citywide Slurry Seal Project

Physical Address View project details and contacts
City, State (County) San Pablo, CA 94806   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $523,972 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 10, 2023, the project has not been awarded. An timeline for construction has not been confirmed, however, construction is expected to start in May, 2023. The Project is located at various locations throughout the City, and is described as follows: Dig out and repair of failed pavement, crack seal, slurry seal and pavement delineation, reinstall striping and pavement markings Time for Completion. The Project must be completed within 45 working days from the start date set forth in the Notice to Proceed. The City anticipates issuing the Notice to Proceed begin between April 3 rd and June 5th , 2023, but the anticipated start date will be flexible to accommodate the Contractor's schedule, this date range is neither certain nor binding. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a Bid Proposal. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents