Similar Projects
2021 City Facility Parking Lot Resurfacing and Concrete Repairs
Bidding
Dayton, OH

Removal and Replacement of Certain Curbs and Sidewalks project
Bidding
Vandalia, OH

Parking Lot Maintenance Phase 4 Lots A and D Sinclair Community College
Post-Bid
Less than $824,285 est. value
Dayton, OH

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

Parking Lot Maintenance, Lots A, C and D Sinclair Community College
Results
Less than $777,000 est. value
Dayton, OH 45390

Dayton FB, Parking Lot, NARA-New O&M Contract
Results
Dayton, OH 45402

Keowee Street Rehabilitation
Bidding
Dayton, OH 45426

Free Pike ADA
Post-Bid
Trotwood, OH

Parking Areas - Taylorsville Park Paving
Results
OH

2021 Sidewalk Program and the Concrete Portion of the 2021 Street Program
Post-Bid
Huber Heights, OH

Regional Bike Trail Renovations - Various Locations
Results
Less than $897,290 est. value
Dayton, OH

ELM Street Streetscape Improvements
Post-Bid
$120,000 est. value
West Carrollton, OH 45449

Washington Street Bike Path
Results
Less than $400,000 est. value
Dayton, OH

2021 Curb Rehabilitation Program
Post-Bid
$750,000 est. value
Dayton, OH

2020 Deer Meadow Park Parking Lot Expansion
Results
Moraine, OH

Last Updated 03/12/2021 11:05 AM
Project Title

Belle Plain Park Parking Area

Physical Address View project details and contacts
City, State (County) Huber Heights, OH   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes removal of existing curb and gutter, top soil and trees, relocation of an existing mailbox, installation of asphalt parking area with base and curb. Also a new concrete walk will extend from the parking area to the existing path. Drawing is attached as well as quantity sheet. A portion of the work is in the City’s Right of Way, so the contactor shall be Bonded with the City.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents