Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Fire Station 41 Reconstruction - PB1823 - City Of Overland Park
Demolition, New Construction, Infrastructure
Conception
$13,000,000 CJ est. value
Overland Park, KS 66204

Three Hallbrook Place
New Construction - 119,924 SF
Design
$10,000,000 CJ est. value
Leawood, KS

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Veterans Park Memorial and Fishing Jetties
Infrastructure
Bidding
$1,000,000 CJ est. value
Spring Hill, KS 66083

RFQ Engineering - Engineering Services for Quivira Road - Shawnee Mission Parkway to 75th Street
Infrastructure
Bidding
$2,950,000 CJ est. value
Shawnee, KS 66216

T-Mobile
Renovation - 88,266 SF
Post-Bid
Overland Park, KS 66212

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

Farmers' Market Pavilion Site
Infrastructure
Results
Overland Park, KS

Sidewalk Construction Project
Infrastructure
Results
$499,986 CJ est. value
Olathe, KS 66061

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Watercrest Mix-Use Development
New Construction
Pending Verification
Lenexa, KS 66250

175Th Commerce Centre
New Construction - 1,066,240 SF
Pending Verification
$10,000,000 CJ est. value
Olathe, KS

Neighborhood Park at 159th and Quivira - PR-1875 - City of Overland Park
New Construction, Infrastructure
Conception
$2,150,000 CJ est. value
Overland Park, KS 66204

Last Updated 11/03/2022 01:08 PM
Project Title

TSL Edgerton - Phase 2

Physical Address View project details and contacts
City, State (County) Gardner, KS 66030   (Johnson County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a maintenance building that will have an office and warehouse space to the operation of a truck repair and maintenance facility. As of November 3, 2022, plans have not been submitted to the Edgerton Building Department for permitting. The owner will serve as the general contractor and work will be handled in-house. No inquiries will be accepted. A timeline for construction has not been released.* *Absolutely no inquiries will be accepted at this time. Unsolicited inquiries may result in disqualification in any future bidding opportunities.

Details

,, 10,000 SF - 2,000 SF. 8,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents