Similar Projects
Rodney Complex Park and Stormwater Facilities
Results
Newark, DE 19711

Townsend Tennis and Pickleball Court
Results
Less than $150,000 est. value
Townsend, DE

Playground Improvements Brown Park and Kirkwood Park
Results
Wilmington, DE 19800

Pea Patch Island Improvements
Post-Bid
Less than $1,000,000 est. value
Delaware City, DE 19706

Banning Park –Soccer Field 2
Bidding
Wilmington, DE 19804

Cool Spring Park Playground Renovation
Renovation
Bidding
Wilmington, DE 19806

Coastal Villages
New Construction
Design
Selbyville, DE 19975

Tennis Court Rehabilitation
Results
Lewes, DE

Sussex Technical High School - Track Resurfacing
Renovation
Post-Bid
Georgetown, DE 19947

Last Updated 05/07/2021 09:02 AM
Project Title

Playground Improvements - Canby Grove Park

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19807   (New Castle County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION A. Work of one prime Contract comprises this Project. B. The Project includes but is not limited to the following improvements to Department of Parks and Recreation facilities: 1. Provide demolition and disposal of existing designated playground equipment structures including safety surfacing systems and site accessories as shown on the Drawings. 2. Install and maintain 4 feet high construction fence as shown on the Drawings. 3. Install AND maintain construction entrance measures as shown on the Drawings. At end of project remove measures and restore site as noted on the Drawings. 4. Provide, install (and remove at end of project) protection for existing site features to remain. 5. Provide and install required fill material as needed. 6. Install playground & play structures. Equipment provided by Owner. 7. Furnish and install playground safety surfacing systems and edging. 8. Install new concrete walkway as shown on the Drawings. 9. Reseed disturbed areas of lawn as shown on the Drawings. 10. Maintain and water new lawn areas for one 45 days after final acceptance. 11. Procure and install stormwater management system. 12. Provide project record documents and operation and maintenance data.

Details

Park/Playground, Addition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents