Similar Projects
Jones Farm
New Construction, Infrastructure
Conception
$704,300,000 CJ est. value
Duette, FL 34219

Jones Farm
New Construction, Infrastructure
Conception
$704,300,000 CJ est. value
Duette, FL 34219

Park East at Azario Phase II / Bradenton
New Construction, Infrastructure
Design
$37,565,184 CJ est. value
Bradenton, FL 34205

Key Packaging Building Addition
Addition, Infrastructure - 11,250 SF
Design
$1,200,000 CJ est. value
Sarasota, FL 34243

Moccasin Wallow Road - US 41 to Gateway Boulevard
Infrastructure
Bidding
$22,072,453 CJ est. value
Palmetto, FL 34221

Moccasin Wallow Road - US 41 to Gateway Boulevard
Infrastructure
Bidding
$22,072,453 CJ est. value
Palmetto, FL 34221

Compass Villas - One Particular Harbour
New Construction, Infrastructure - 11,869 SF
Sub-Bidding
$3,200,000 CJ est. value
Bradenton, FL 34209

Riverview6
New Construction, Infrastructure - 96,067 SF
Post-Bid
$18,000,000 CJ est. value
Bradenton, FL 34205

King Middle School Covered Walkways
Infrastructure
Post-Bid
Bradenton, FL 34209

North River Ranch Phases 1C and 1D West
Results
FL

Parking Lot Expansion Phase 2
Results
Sarasota, FL 34243

Silverstone North - Site Only
New Construction
Construction
Palmetto, FL 34221

Fort Hamer Crossing
New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Parrish, FL 34219

Fort Hamer Crossing
New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Parrish, FL 34219

C Basin High Service Pump and Motor Replacement
Infrastructure
Bidding
$350,000 CJ est. value
Bradenton, FL 34212

Last Updated 08/02/2022 09:09 AM
Project Title

First Baptist Church Parking

Physical Address View project details and contacts
City, State (County) Palmetto, FL 34221   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

NOTICE IS HEREBY GIVEN that the City of Palmetto will receive sealed bids from individuals, corporations, partnerships, and other legal entities authorized to do business in the State of Florida, to furnish all materials; labor and equipment for the installation of new Low Impact Design Pervious Pavers for diagonal parking, as specified in Invitation for Bid. The site encompasses approximately 21,000 SF and includes parking, lighting, signage and landscaping. The City reserves the right to accept or reject any and/or all bids, to waive irregularities and technicalities, and to request resubmission. The City also reserves the right to accept all or any part of the bid and to increase or decrease quantities to meet additional or reduced requirements of the project. MBE/WBE participation is encouraged. Every request for such an interpretation shall be made in writing and emailed to the Purchasing Agent at nhaisley@palmettofl.org no later than 5:00 pm EST on Friday, July 1, 2022. A bid guarantee equivalent to five percent (5%) of the bid price is required. The "bid guarantee" shall consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument which must be submitted with the bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required within the time specified Upon execution of a contract for work covered by this project or parts of this project, the Contractor shall furnish surety bond in an amount not less than 100 percent of the contract price each (100% Performance Bond and 100% Payment Bond). The surety bond must remain valid for one year beyond the date of acceptance of the completed construction project Due to expected delays in material delivery, this notice will not be issued until all materials have arrived. Duration of the project shall be to commence work under this contract with an adequate force and equipment within ten (10) consecutive calendar days after receipt of written notice from the City to proceed and to fully complete all necessary work under the same within not more than Ninety (90) consecutive calendar days.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents