Similar Projects
Last Updated | 09/19/2023 11:19 AM |
Project Title | RFQ Construction Manager at Risk (CMAR) - ERL Addition and Renovation |
Physical Address | View project details and contacts |
City, State (County) | Rolla, MO 65409 (Phelps County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected October 2024 |
Bids Due | View project details and contacts |
Estimated Value | $43,026,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | shall consist of the review and ranking of each respective firm’s qualifications and responses to the university’s selection criteria as stated herein. This is a competitive process with points awarded for each category of the selection criteria. The university will utilize a review panel to evaluate the offerings and establish a preliminary ranking of the firms. Five or fewer firms with the highest preliminary ranking based on the firm’s responses to the selection criteria will be interviewed by the owner’s panel. At a minimum, the proposed project director/executive, senior project manager(s), scheduling manager(s), assisting project manager(s) and superintendent(s) shall attend the interview. The interview will include introductions with each proposed staff member summarizing their responsibilities and experience, followed by a question-and-answer session conducted by the Owner. The questions will not be provided prior to the interview. The respondent will be allowed fifteen minutes to present information supporting their response to this RFQ, followed by a question-and-answer session for the balance of the interview. Following the establishment and ranking of the short-listed firms, the RFP documents will be issued to the short-listed firms. The short-listed firms shall submit their cost proposal in a sealed envelope, including their construction phase fee, lump sum cost for fulfilling the general conditions, cost of insurance and cost of performance and payment bonds, all in accordance with the step two provisions. The Preconstruction Services scope shall be included as provision D.2. and the Preconstruction Fee shall be included in provision D.5., both as indicated on the contractor’s agreement. The final selection of the construction manager at risk will be based on a 25,000 - point system. Forty percent (40%) (10,000 points) will be awarded as established by the review panel based on qualifications, responses to the university’s selection criteria, references, the Owner’s prior experience with the respondent, and the interviews, all under a competitive process. Three hundred (300) bonus points will be awarded to an SDVE proposer. The 300 bonus points will be added to the SDVE’s qualifications score as established by the Owner’s review panel. The 300 bonus points are available only to an SDVE firm submitting a proposal directly to the Owner. The remaining sixty percent (60%) (15,000 points) will be awarded based on the sum total of, the construction phase fee, the lump sum for fulfilling the general conditions, the cost of insurance and performance and payment bonds and preconstruction fee. For evaluation purposes, the construction phase percentage fee will be multiplied by the anticipated construction budget to establish the overhead and profit component of the price. The lowest total price submission will receive 15,000 points. Ascending price submission totals from other firms will be awarded price points on a pro rata basis. The owner reserves the right to seek clarifications. Contract award November 17, 2023 Phase 1 (addition) Construction Start October 2024 Phase 2 (renovation) Construction Start November 2024 |
||||||||||||||||||||||||||||||||||||||
Details | 86,470 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |