Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Provide Addition - Construction Work
Addition, Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Morrisville, NY 13408

Provide Addition - Plumbing Work
Addition, Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Morrisville, NY 13408

Provide Addition - Electrical Work
Addition, Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Morrisville, NY 13408

Asphalt Concrete Paving
Alteration
Post-Bid
Canastota, NY

2021-2026 Snow and Ice Removal Services
Infrastructure
Post-Bid

Cold In-Place Recycling
Results
NY

Hot Mix Asphalt
Term Contract
Results
NY

Provide Addition - HVAC Work
Addition, Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Morrisville, NY 13408

Bridge Washing Project
Infrastructure
Post-Bid
$500,000 est. value

On Demand Repairs to Thruway Infrastructure
Infrastructure
Results

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Replacement of Worn or Missing Pavement Markings
Infrastructure
Results
$2,900,000 est. value

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Cold In-Place Recycling
Term Contract, Infrastructure
Results
NY

Last Updated 08/08/2022 09:47 AM
Project Title

Hot Mix Asphalt

Physical Address View project details and contacts
City, State (County) Madison, NY 13402   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,219,077 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Hot Mix Asphalts - The work to be done under the Contract, in accordance with the Contract Documents and as required by the conditions of the site, consists of performing, installing, furnishing and supplying of all materials, equipment, labor and incidentals necessary or convenient for the construction of the work outlined below, and the carrying out of all duties and obligations imposed upon the Contractor by the Contract Documents. The scope of work of this Contract shall be the furnishing, transporting, placing and rolling of; Superpave 25mm Binder course, Item #402.25; Superpave 9.5mm Top course, Item #402.09; Tack Coat, Item #407.01 as called for elsewhere in these specifications. Time of commencement for the hot mix paving shall be July 11, 2022 with a completion date of July 10, 2023.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents