Similar Projects
Z1da--554-21-132 Install Di Water Drops for Lab Analyzer and Sinks (Va-21-00047723)
Design
$25,000 to $100,000 est. value
Aurora, CO 80045

2Da--575 - (Con) Install Secondary Domestic Water Service
Term Contract
Design
$25,000 to $100,000 est. value
Grand Junction, CO 81501

Airport Plumbing On-Call and Maintenance
Term Contract
Post-Bid
Aspen, CO 81611

Plumbing Pipes and Fittings
Post-Bid
Denver, CO 80202

As-Needed HVAC, Mechanical and Plumbing Services
Term Contract
Results
Aspen, CO 81611

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Weatherization Materials - Energy Resource Center
Term Contract, Alteration
Construction
Colorado Springs, CO 80903

MDF Drinking Fountains
Post-Bid
Brighton, CO 80601

Z1DA--554-21-130 Install DI Water Faucets on Sinks
Results
$25,000 to $100,000 est. value
Aurora, CO 80045

Plumbing and Mechanical Systems
Post-Bid
Pueblo, CO 81003

Water Bottle Filling Stations
Results
Poudre Park, CO

Heating and Plumbing Services
Term Contract
Post-Bid
Arapahoe, CO

Annual Maintenance - Plumbing Repairs
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Plumbing
Term Contract
Post-Bid
Denver, CO 80223

Eyewash and Safety Showers
Results
Fort Collins, CO 80521

Reported 09/16/2021 05:08 PM
Project Title

Pumping System Improvements

Physical Address View project details and contacts
City, State (County) Pagosa Springs, CO   (Archuleta County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed generally includes, but may not be limited the following components: (a) removal of existing above grade pumping system located at Sweetwater Drive and N. Pagosa Blvd; (b) Installation of submersible pumping system including all necessary appurtenances; (c) Installation of a six foot diameter valve vault including all necessary appurtenance; (d) Temporary sewage bypass around Lift Station 11 during construction period, (e) The project includes all associated materials, equipment and appurtenances required for a completely functioning system.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents