Similar Projects
Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Saratoga Dignity Care Assisted Living - Rebid
New Construction, Infrastructure - 61,420 SF
Sub-Bidding
$20,000,000 CJ est. value
Saratoga Springs, UT 84045

Sanctuary
New Construction, Infrastructure
Sub-Bidding
$155,000,000 CJ est. value
Lehi, UT 84043

River Bottom Improvement Project Prequalification
Post-Bid

2021 Roads Project
Post-Bid
Lehi, UT

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

Otteson Subdivision Street Improvements
Alteration
Pending Verification
Salem, UT 84653

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

2020 2000 South PRV Project
Results
Orem, UT 84058

Spanish Fork 3 Parking Lot Expansion
Alteration
Construction
Spanish Fork, UT 84660

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Last Updated 08/01/2022 05:02 PM
Project Title

1300 West Street Realignment Project

Physical Address View project details and contacts
City, State (County) Pleasant Grove, UT 84062   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,295,171 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 1, 2022, project was awarded to Newman Construction Inc., awarded amount is $2,295,171.25** The Principal Items of Work Are Approximately as Follows: Construct Approximately 8970 Square Yards of Roadway With Curb and Gutter. Install Approximately 335 Feet of 8" Pvc C-900 Dr-18 Culinary Water Pipe and Associated Appurtenances. Install Approximately 960 Feet of 48" Class V Rcp, 20 Feet of 42" Class V Rcp, 70 Feet of 18" Class Iii Rcp, and 120 Feet of 15" Class Iii Rcp Storm Drain, 600 Feet of 15" Class V Rcp, 30 Feet of 18" Class V Rcp, 90 Feet of 36" Class V Rcp Storm Drain and Associated Appurtenances. Install 601 Feet of 24" Pvc Sewer Pipe, Install New Manholes, and Bypass Pumping. All BIDDERS are required to have payment and performance bonds underwritten by a Surety Company approved by the U.S. Department of the Treasury. (Circular 570, latest edition). Owner Reserves the Right to Accept or Reject Any or All Proposals, or Any Part of Any Proposal. Owner Reserves the Right to Waive Any Informality in Part or in Whole if It Is Deemed To Be in the Best Interest of Owner

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents