Similar Projects
Last Updated | 06/13/2023 04:34 AM |
Project Title | Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders and Pavement Markings on Hunt Road |
Physical Address | View project details and contacts |
City, State (County) | Adrian, MI 49221 (Lenawee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $540,200 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 3.04 mi of hot mix asphalt cold milling and resurfacing, aggregate shoulders and pavement markings on Hunt Road from Wolf Creek Highway to Bent Oak Highway, Lenawee County. This is a Local Agency project. Net classification required for this project is 524 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3A. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No STUL 46000 208264A 23A0538 MI DOT - 2306 055 - Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders and Pavement Markings on Hunt Road |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |