Similar Projects
Concrete Work for the Mae Meissner Whitaker Park
Infrastructure
Design
$400,000 CJ est. value
Bunker Hill, IL 62014

Washington Community High School - Parking Lot Repaving - Phase 02
Infrastructure
Post-Bid
$300,000 CJ est. value
Washington, IL 61571

Bituminous Materials (Seal Coat)
Infrastructure
Post-Bid
$300,000 CJ est. value
Vandalia, IL 62471

Building Demolition Project - Hickory Grove Banquet Center
Demolition, Infrastructure
Results
$361,900 CJ est. value
Rochelle, IL 61068

Concrete Replacement Work
Alteration
Results
Shelbyville, IL 62565

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Junior High School HVAC Replacement - Phase 1
Renovation
Post-Bid
$262,000 CJ est. value
Heyworth, IL 61745

Single Span Reinforced Concrete
Alteration
Results
Joliet, IL

Asphalt Maintenance and Sealcoating
Infrastructure
Post-Bid
$78,000 CJ est. value
New Lenox, IL 60451

Metamora Township High School HVAC Renovation
Alteration
Results
Metamora, IL

Clissold Elementary Annex and Parking Lot Renovation Project
New Construction, Infrastructure, Renovation - 10,077 SF
Post-Bid
$2,167,000 CJ est. value
Chicago, IL 60643

Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement
Infrastructure, Alteration
Results
Darien, IL

H1 and H2 Grout Replacement
Alteration
Post-Bid
$60,000 est. value
Oswego, IL

2022 Concrete Flatwork
Alteration
Results
Lake Zurich, IL

Last Updated 02/14/2024 02:55 PM
Project Title

Mound Road over Stevens Creek Bridge

Physical Address View project details and contacts
City, State (County) Decatur, IL 62526   (Macon County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $394,949 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Substructure concrete repairs to abutment, slope-walls and piers - Mound Road over Stevens Creek The proposed improvement designated as Section 19-00935-00-BR, beginning at Sta. 14+31.25 (Back of West Abutment), along the existing centerline of West Mound Road (FAU 7359) and extending in an easterly direction to Sta. 15+68.75 (Back of East Abutment), includes substructure repairs to the existing concrete abutments, slopewalls, and piers to be accomplished utilizing temporary shoring and cribbing of existing deck beams with no in-stream work or work to be done from above the roadway level. The work shall be performed during a low water period to access as many of the repair areas as possible. This work shall consist of sealing cracks in slope wall with a non-sag elastomeric polyurethane sealant.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents