Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Polypropylene Pipe
Results

Resurfacing, Milling, Shoulder Reconstruction, and Pavement Markings on US 52
Infrastructure
Results
NC

Statewide Intelligent Transportation System
Infrastructure
Post-Bid

Bus Driveway Improvements at Mount Airy Middle School Mount Airy City Schools
Infrastructure
Results
Mount Airy, NC 27030

HDPE Pipe
Infrastructure
Results
Boone, Dobson, Newland, North Wilkesboro, Sparta, West Jefferson, Yadkinville, NC

Resurfacing, Milling, Patching, Leveling, Shoulder Reconstruction, and Pavement Markings
Infrastructure
Results
NC

Resurfacing with Asphalt Surface Treatment
Infrastructure
Results

Corrugated Aluminized Pipe
Infrastructure
Results

Pipe Liner
Infrastructure
Results
Dobson, NC 27017

Corrugated Aluminized Pipe
Infrastructure
Results

Diamond Grinding PCC Pavement and Long-Life Pavement Markings on I-77 NBL and SBL from Mile Marker 91.0 to Mile Marker 95.0
Infrastructure
Results
$3,000,000 est. value
NC

ID/IQ Contract: Trenchless Installation of Welded Steel Drainage Pipe (Bore & Jack), Upon Request
Infrastructure
Results

Grading, Drainage, Paving, and Structure
Infrastructure
Results
$3,000,000 est. value
Dobson, NC

Last Updated 09/22/2022 12:32 PM
Project Title

Granite City Greenway Trail Extension and Ararat River Restoration Project

Physical Address View project details and contacts
City, State (County) Mount Airy, NC 27030   (Surry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of 6,725 linear feet of new paved greenway trail adjacent to the Ararat River and approximately 2,889 linear feet of enhancement and restoration to the Ararat River. The Project includes installation of a 50 linear-foot pedestrian bride structure, 145 LF of sidewalk, picnic shelters, bike racks, benches and signage along the new extension and installation of outdoor fitness equipment on a previously completed section of greenway. The City of Mount Airy will accept sealed bids from Prequalified Contractors for the construction of the Mount Airy Granite Greenway Trail Extension and Ararat River Restoration Project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents