Reported | 01/29/2022 12:00 AM |
Project Title | Black Diamond Site Soil Removal |
Physical Address | View project details and contacts |
City, State (County) | Huntington, WV 25704 (Cabell, Wayne Counties) |
Category(s) | Commercial |
Sub-Category(s) | Office |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected February 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximately 30 dirt pit areas within the buildings at the Black Diamond site will be excavated to a depth of three (3) feet below existing floor level. Gravel rock will be used to backfill each of the dirt pit excavations to approximately 12 inches below the existing concrete floor. The gravel will be compacted in lifts and crusher run will be added and compacted to approximately 6-8 inches of the existing concrete floor level. Cement with 6”x6” wire support will be used to fill the remaining excavation and leveled to match the existing concrete floor elevation. |
||
Details | Office, Renovation.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |