Similar Projects
Leachate Hauling, Treatment, and Disposal
Post-Bid
FL

Three Oh Six 20/21 Timber Sale
Post-Bid
FL

Derelict Vessel Removal
Results
FL

Emergency Response and Recovery Services
Results
Deltona, FL 32725

Crooked Road 20/21 Timber Sale
Post-Bid
FL

Lot Maintenance
Results
FL

Pre-Event Cut and Toss
Post-Bid

Emergency Response and Recovery Services
Results
Deltona, FL

Transport of Biosolids
Term Contract
Post-Bid
DeBary, FL 32713

Refuse Collection Services for County Facilities
Results
FL

Transport of Liquid Biosolids
Term Contract
Post-Bid
DeBary, FL 32713

Timber Sale Crescent Lake
Term Contract
Results
Less than $64,780 est. value
FL

Debris Removal, Reduction and Recovery
Infrastructure
Post-Bid
Ormond Beach, FL

Disaster Recovery Services
Results
FL

Disaster Debris Removal and Recovery Services
Infrastructure
Post-Bid
DeBary, FL

Last Updated 12/06/2021 11:39 AM
Project Title

Garnsey Water Plant Dewatered Lime Sludge Disposal

Physical Address View project details and contacts
City, State (County) Port Orange, FL   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In order to maintain operational reliability of the water treatment plant, daily removal of processed Lime Sludge is required. 1. Estimated expended Lime Sludge quantities average 17-34 Tons per Day, seven days per week with an estimated annual average of 9,000 Tons. 2. The City of Port Orange will assign City personnel to deliver the Lime Sludge to the Contractor. 3. Contractor shall be responsible for the location for receiving the Lime Sludge and the site for the material disposal. 4. Contractor shall coordinate with the Water Plant Operators for daily deliveries of Lime Sludge loads, up to three per day. Garnsey Water Plant operation is continuous, and loads will be delivered 365 days per year.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents