Last Updated 03/09/2020 02:10 AM
Project Title

Beste Reconstruction and Water Main Replacement

Physical Address View project details and contacts
City, State (County) Saint Clair Shores, MI   (Macomb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract also includes all the work required to rehabilitate by open cut repair the main line sanitary sewers which have collapsed, failed, or are otherwise obstructed. The project shall include reconnection of leads to the mainline, pavement removal and replacement and complete restoration of all disturbed areas. This project (as identified by the plan) involves the open cut rehabilitation of sewers in continual use. It shall be the responsibility of the Contractor to ensure that the rehab operations do not interfere with the functioning of the sewer. In the event that work is suspended due to a rainfall event, no payment will be made in addition to the normal unit prices.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents