Similar Projects
Chiller Maintenance
Term Contract
Bidding
Wright Patterson Air Force Base, OH

Botanical Research HVAC Replacement
Alteration
Bidding
$360,000 est. value
Athens, OH 45701

Eastland Fairfield Career Center - EFCC 2020 Improvements
Post-Bid
Less than $195,000 est. value
Groveport, OH 43125

HVAC Guaranteed Maintenance PM and Service
Post-Bid
Dayton, OH 45390

Y--Mace House HVAC
Results
$100,000 to $250,000 est. value
Chillicothe, OH 45601

District Wide HVAC Building Automation System Upgrades (1589)
Results
$473,209 est. value
Cleveland, OH 44115

Maintain and Repair Heating, Ventilation and Air Conditioning Systems
Alteration
Bidding
Cleveland, OH

Piping Replacement
Post-Bid
Dayton, OH 45390

Mahoning County Career and Technical Center Lab Upgrades Project
Results
$448,500 est. value
Canfield, OH 44406

HVAC Modifications-Phase 1 and 2
Alteration
Bidding
$872,698 est. value
Dayton, OH 45402

Main Office Roof and RTU Replacement
Post-Bid
Canton, OH 44702

Horizon Hills Apartments Cooling Systems Upgrades and Modifications
Results
Cincinnati, OH 45204

179AW ARMAG HVAC Requirement
Alteration
Bidding
Mansfield, OH 44903

Stark Attention Center/ Community Corrections Facility HVAC Replacement
Post-Bid
Less than $350,000 est. value
Canton, OH 44706

Community Estates Drive HVAC Renovations
Results
Ravenna, OH 44266

Reported 12/11/2021 12:00 AM
Project Title

White Hall Front Campus Chiller Plant Replacement / Design-Build

Physical Address View project details and contacts
City, State (County) Kent, OH 44240   (Portage County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $7,500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The existing Front Campus Chiller Plant (This Project) is comprised of individual chiller equipment at or near end of service life at three (3) separate connected locations that do not operate or pump efficiently. The existing independent chiller systems cannot operate during winter months, (typically October 15 through April 15) which limits the ability to provide consistent environmental conditions for research laboratories including a vivarium in the served buildings. At least some capacity should be able to operate the entire year with the new plant. The separate plants are located at: White Hall (1-350 ton electric, 1- 350 ton steam abs.), Merrill Hall (2-178 ton electric) and Cartwright Hall (2-350 ton steam abs.). The existing plants are controlled through the Johnson Controls Inc. Central Plant Optimization (JCI CPO) BAS.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents