Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Place Slurry Seal, Rejuvenating Scrub Seal and Replace AC Surfacing
Infrastructure
Bidding
$1,990,000 est. value
CA

2021 Pavement Project
Infrastructure
Bidding
Piedmont, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Lincoln Elementary School Play Yard
Renovation, Alteration
Bidding
Burlingame, CA

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Street Repair and Resurfacing (Slurry Seal/Rubber Cape Seal)
Alteration
Bidding
Los Gatos, CA

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Standiford Elementary School - Pavement Replacement Project and Site Improvements
Infrastructure
Bidding
Modesto, CA 95350

Last Updated 03/10/2022 12:33 PM
Project Title

Napa Valley Vine Trail - Street Helena to Calistoga

Physical Address View project details and contacts
City, State (County) Calistoga, Saint Helena, CA 94574   (Napa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the installation of a 7.4 milelong Class I bicycle and pedestrian path in the County of Napa from Pratt Avenue in St Helena to Fairway Drive Extension in the City of Calistoga. The majority of the path runs on the east side of State Route 29. This mixed-use facility consists primarily of a 10' wide asphalt concrete path with 2' shoulders, three bridges over Deconinck Wetland, Twomey Drainage and Napa River Crossing, installation of 2 new Pedestrian Hybrid Beacon (PHB) traffic signals, signage and striping, retaining walls, fencing, new drainage structure, biological mitigation, tree removal, landscaping and irrigation. Existing drainage features and patterns will remain along the extent of the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents