Similar Projects
Above Ground Petroleum Storage Tanks
Infrastructure
Bidding
$80,000 est. value
Milwaukee, WI

Bldg. 203 W5 Tank Replacement
Addition
Post-Bid
Milwaukee, WI 53207

High-Vacuum Chamber Modification
Post-Bid
Madison, WI

Softener System Modifications
Results
Less than $180,000 est. value
Madison, WI

Elevated Spheroid Repainting and Repairs
Results
$389,500 est. value
WI

Tower Site Construction
Infrastructure
Post-Bid
WI

Washburn Water Tower Painting and Mixing
Results
Oshkosh, WI 54904

Lac du Flambeau 250K Steel Elevated Water Tower Improvements
Infrastructure
Post-Bid
Lac du Flambeau, WI

Elevated Tank Repaint
Term Contract
Results
Brookfield, WI

East 400,000 Gallon Elevated Tank
Infrastructure
Post-Bid
$2,400,000 est. value
Windsor, WI

Lincoln Avenue 1.0 Mg Composite Water Tower Rehabilitation
Renovation
Results
Plover, WI

Frank H Elevated Tank Repainting
Results
Waunakee, WI

Dilution and Mixing Tanks 1 and 2 Rehabilitation
Results
Milwaukee, WI

Water Tower Rehabilitation
Results
WI

Acid Crock Treatment
Results
Milwaukee, WI 53204

Last Updated 05/10/2022 01:31 AM
Project Title

500,000 Gallon North Water Tower

Physical Address View project details and contacts
City, State (County) River Falls, WI   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 LS Maintenance of Traffic 1 EACH Tracking Pad 2 EACH Inlet Protection 1,145 LF Silt Fence 1 EACH Mobilization 160 LF Sawcutting Pavement 70 LF Removing Curb & Gutter 112 SY Removing Asphalt 1 LS Salvage Hydrant 1,140 LF 1-1/4-Inch Non-Metallic Conduit with Pull String 1,190 CY Common Excavation 30 CY Breaker Run 500 CY Crushed Aggregate Base 30 TON HMA 70 LF 30-Inch Concrete Curb & Gutter 150 SF 6-Inch Concrete Driveway 60 LF 6-Inch Ductile Iron Water Main 1,261 LF 16-Inch Ductile Iron Water Main 4 EACH 6-Inch Gate Valve & Box 6 EACH 16-Inch Gate Valve & Box 3 EACH Hydrant 3 EACH Connect to Existing Water Main 132 SF Insulation 2,480 LBS Fittings 1 EACH 27-Inch Catch Basin with Casting 10 LF 12-Inch RCP Class IV Pipe 1 EACH Connect to Existing Storm Sewer Inlet 1 LS 0.5 MG Elevated Water Storage

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents