Similar Projects
Preservation - District 6
Infrastructure
Bidding

Road Work - Charles Brown Road Wadmalaw Island, Paving Project TST
Infrastructure
Bidding
Wadmalaw Island, SC 29487

On-Call Pavement Maintenance and Repair
Term Contract, Infrastructure
Post-Bid
James Island, SC

Roadwork - Ashley Hall Plantation Road Right Turn Lane
Infrastructure
Post-Bid
Charleston, SC 29407

Repair Airfield Parking Ramp Joint Base Charleston, SC
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Reconstruction/Rehabilitation - District 6
Results

Road Work - Trexler Avenue Improvements TST
Infrastructure
Post-Bid
Hollywood, SC 29449

Trolley Barn Parking Lot
Results
$450,000 to $600,000 est. value
Charleston, SC 29403

Road Work - Ashely Hall Plantation Road Right Turn Lane TST
Infrastructure
Post-Bid
Charleston, SC 29407

Rosebank Road Improvement Project
Results
North Charleston, SC

Safety Improvements I-20 - District 6
Results

Full Depth Patching-District 6
Results

Intersection Improvements - S-732
Results

FY20 Resurfacing North Charleston
Results
North Charleston, SC

Crack Seal - District 6
Term Contract
Results

Reported 01/21/2022 12:00 AM
Project Title

Construction of US 17 to Rifle Range Road Connector

Physical Address View project details and contacts
City, State (County) Mount Pleasant, SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of the construction of roadway on new alignment from US 17 North at Old Georgetown Road to Rifle Range Road in Mount Pleasant as shown on the Plans. Construction activities include, but are not limited to clearing and grubbing, grading, stormwater drainage, asphalt paving, sidewalk construction and landscaping. Also included in the work is utility relocations (water line), traffic control, erosion control and pavement markings. The total length of the project is 1.378 miles of new alignment roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents