Similar Projects
F-35: Repair Hangar Bldg 1201
Renovation
Results
Montgomery, AL

Demolition and Replacement of the North Apron Hangars at Foley Municipal Airport
Renovation
Results
$1,600,000 est. value
Foley, AL 36535

Hangar E - Part A
New Construction
Post-Bid
Meridianville, AL 35759

Pryor Field Hangar Project
New Construction - 19,430 SF
Results
Tanner, AL 35671

Improvements to Albertville Regional Airport
New Construction
Post-Bid
Albertville, AL 35950

Shelby County Airport Mass Hangar D
Results
Less than $598,926 est. value
Calera, AL 35040

RMACC-Phase II-Hazardous Devices School Fuselage Training Facility
Results
$500,000 to $1,000,000 est. value
Redstone Arsenal, AL

T-Hangar Construction Project
New Construction
Post-Bid
Auburn, AL 36830

Aircraft and Flight Equipment Building, Redstone Arsenal, Alabama
- 60,000 SF
Results
$25,000,000 to $100,000,000 est. value
Redstone Arsenal, AL 35898

Last Updated 10/04/2021 07:35 AM
Project Title

Allied Support Sun Shelters

Physical Address View project details and contacts
City, State (County) Montgomery, AL   (Montgomery County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a free standing aircraft shelter and is inclusive of, but not limited to, the following scope of work: Installation of new pre-engineered metal aircraft shelter. Installation of new lighting and convenience receptacles within the aircraft shelter. Installation of new electrical service/distribution as required to support electrical requirements of the F35 Support Equipment utilized at the shelter. Primary power will include a directional bore to extend primary electrical service from an existing pad mounted transformer on the Northwest corner of the aircraft apron to the new service distribution system on the apron. Installation of new lighting protection systems at new aircraft shelter. Installation of a directional bore and empty conduit for installation of fiber optic cabling by the government at a later date. Cleaning of the entire aircraft apron/ramp and removal of all existing painted pavement markings. Installation of new painted pavement markings as indicated on the Civil drawings to provide modified taxi lines to coordinate with the new Shelter and increased wingspan of the F35 Airframe.

Details

Aircraft Hangar, New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents