Similar Projects
Waterfront Improvements Phase I
Infrastructure
Design
$742,100 CJ est. value
Bowdoinham, ME 04008

Waterfront Improvements Phase I
Infrastructure
Design
$742,100 CJ est. value
Bowdoinham, ME 04008

Richmond Maintenance Facility Buildings
New Construction, Infrastructure - 4,000 SF
Post-Bid
$500,000 est. value
Richmond, ME 04357

Maine School Administative District 75 High School Project
New Construction, Infrastructure - 150,000 SF
Post-Bid
$47,522,000 CJ est. value
Topsham, ME 04086

2021 Roadway Improvements
Infrastructure
Results
Bowdoinham, ME 04008

Fire Station Paving Project
Infrastructure
Results
Bowdoinham, ME 04008

Glenvale Topsham Meadow Solar
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Topsham, ME 04086

New Fire Station - City Of Bath
Demolition, Build-out, Renovation, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Bath, ME 04530

Market Basket
New Construction, Infrastructure - 80,000 SF
Design
$21,000,000 CJ est. value
Topsham, ME 04086

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

57 Recycle Drive Lot 3
New Construction, Infrastructure - 20,585 SF
Pending Verification
$5,300,000 CJ est. value
Topsham, ME 04086

$UPDATE PRESS - Mount Ararat High School - Arthur C. Dudley Construction
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Topsham, ME 04086

Statewide Geotechnical Drilling
Infrastructure
Results

Midcoast Youth Hockey
New Construction, Infrastructure - 28,000 SF
Design
$8,000,000 CJ est. value
Topsham, ME 04086

Waterfront Parks and Pathways Guilford Lot and Bathport
Infrastructure
Results
Bath, ME

Last Updated 10/17/2022 05:07 PM
Project Title

The Uptown

Physical Address View project details and contacts
City, State (County) Bath, ME 04530   (Sagadahoc County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project appeared before the City of Bath Planning Board on October 4, 2022 for a Site Plan amendment. Information regarding the architect and general contractor has not been determined. Although a firm timeline for construction has not been determined, construction is not expected to begin before spring 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction. Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents