Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Walmart Warranty Work 2022
Infrastructure
Bidding
$300,000 est. value
Tehachapi, CA

Talbert Channel Storm Drain Repair Project
Infrastructure
Bidding
$86,289 est. value
Fountain Valley, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

Removal and Transport of Grit, Scum/Sludge, and Storm Water
Infrastructure
Bidding
San Diego, CA

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Marie Canyon Green Streets Improvements Project
Infrastructure
Bidding
$300,000 est. value
Malibu, CA

Harbor Bay Isle Lagoon Improvements Project
Infrastructure
Post-Bid
$250,000 est. value
Alameda, CA 94502

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Reported 06/04/2022 12:00 AM
Project Title

Nicolas Road From Phase 2 Boundary to Westerly End of Improvements to Liefer Road and Nicolas/Calle Girasol Culvert and Channel Improvements

Physical Address View project details and contacts
City, State (County) Temecula, CA   (Riverside County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $12,687,500
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a civil project in Temecula, California. Completed plans call for site work for a water / sewer project. Wingsweep Corporation and Woodside Homes of California, LP, jointly as Owners under the Roripaugh Ranch Phase 2 Joint Development Agreement (Developer) and Decatur Advisors Llc (Developer's Representative) Will Receive Bids for: Project No. 2b & 2c Nicolas Road From Phase 2 Boundary to Westerly End of Improvements to Liefer Road & Nicolas/calle Girasol Culvert and Channel Improvements Bids are requested for construction of earthwork, erosion control, traffic control, street surfacing, site concrete, arch culverts, retaining walls, wet and dry utilities and landscaping, specifically relating to the completion of improvements to be located east and west of the intersection of Nicolas Road and Calle Girasol in the City of Temecula. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents