Similar Projects
Upgrade 1000 Gallon Trinity Container
Bidding
San Antonio, TX

Bluebriar Drive 350,000 Gallon Elevated Water Tank Project
Bidding
Less than $1,692,000 est. value
Granite Shoals, TX 78654

Above Ground Storage Tank and Containment
Post-Bid
College Station, TX 77842

CID 05 - 2020 Ground Storage Tanks - E
Post-Bid
$724,000 est. value
Elmendorf, TX 78112

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Sherwood Shores III Water System Booster Station Hydro-Pneumatic Pressure Tank Project
Bidding
Less than $85,000 est. value
Granite Shoals, TX

CID 04 - 2020 Composite Elevated Storage Tank - D
Post-Bid
$1,065,000 est. value
Elmendorf, TX 78112

NACO Ground Storage Tank Rehabilitation Project
Results
Less than $1,884,210 est. value
San Antonio, TX 78233

Steven M. Clouse Water Recycling Center Underground Storage Tank Removal Project
Bidding
$134,700 est. value
San Antonio, TX 78275

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Spicewood Beach Water Tank Replacement
Results
Spicewood, TX 78669

Crestline Water Production Facility Improvements
Infrastructure
Bidding
Pleasanton, TX 78064

Peppermint Elevated Storage Tank Rehabilitation
Post-Bid
Less than $486,000 est. value
Kirby, TX 78219

2020 Citywide Water Storage Tank Rehabilitation Project
Results
Less than $725,000 est. value
Smithville, TX 78957

Reported 05/07/2021 12:00 AM
Project Title

Tower Repair Project

Physical Address View project details and contacts
City, State (County) TX   (Archer County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing riser pipe. Furnish and install new schedule 40 steel pipe starting at the base elbow and extending into the bottom of the tank. Furnish and install a new bellows style expansion joint below the tank belly. Coat the new riser pipe with NSF approved epoxy coating system and touch up any areas affected by the new pipe installation.

Details

Division 05 - Metals.
Division 33 - Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Aboveground Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents