Similar Projects
Dermatology Offices Fire Suppression
Renovation
Sub-Bidding
$86,000 CJ est. value
Oklahoma City, OK 73104

Installation of a New Fire Alarm System
Alteration
Post-Bid
Norman, OK

20-004873 PTS Replace Fire Suppression, MMAC, Oklahoma City
Term Contract
Post-Bid
$750,000 to $1,500,000 est. value
Oklahoma City, OK 73169

Fire Protection Renovation
Results
McAlester, OK 74501

Fire Alarm System Replacement - Tulsa, OK (Epm 55239)
Results
$1,000,000 to $5,000,000 est. value
Tulsa, OK 74103

Halon Fire Extinguisher MX
Term Contract
Post-Bid
Altus, OK 73522

Fire Alarm System Replacement - Muskogee OK
Results
$1,000,000 to $5,000,000 est. value
Muskogee, OK 74401

PTS Fire Suppression Replacement at the Mike Monroney Aeronautical Center (MMAC)
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
Oklahoma City, OK 73159

Contractor Shall Provide Fire Monitoring, Inspections, Maintenance, Emergency Service Calls and Technical Support at The Lawton Indian Hospital, Lawton, Oklahoma
Term Contract
Results
Lawton, OK 73507

Bid Package 21A Fire Suppression Cookshack Expansion Project
Alteration
Post-Bid
$350,000 est. value
Ponca City, OK 74601

Annual Fire Apparatus Maintenance and Testing
Term Contract
Results
Savanna, OK 74565

GIA Fire Pump Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Tulsa, OK 74103

Wet Chemical Fire Suppression Systems Services
Term Contract
Results
Altus, OK 73522

Bixby Public Schools - High School Academic Building - Fire Suppression Rebid
Renovation
Post-Bid
$200,000 CJ est. value
Bixby, OK 74008

Site and Building
Infrastructure, Alteration
Results
Norman, OK

Last Updated 01/23/2023 03:03 PM
Project Title

Fire Alarm Upgrade

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $31,400,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of complete replacement and upgrade of the fire alarm system to a voice evacuation system including panels, devices and wiring at the Senior High School on all 3 floors of the Howell, MSB Building, the Fine Arts Building, the Commons, both floors of the Cafeteria Building, both floors of the Anderson Building, both floors of the Old Boys Gym and the Girls Gym and all ancillary spaces and connections of building as shown on drawings. This is a total of 6 buildings ranging from two -three stories. As of January 23, 2023 construction has commenced in December 2022. *This project has been awarded and all trades have been let.

Details

231,118 SF.
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents