Similar Projects
Cadet Field House Phase 2
Renovation
Design
CO 80840

Expand Midfield Facility - AF UMMC
Renovation, Addition - 11,500 SF
Design
$5,000,000 to $7,000,000 est. value
CO 80840

Facilities Management Fort Carson
Post-Bid
Fort Carson, CO 80913

Construct Contract Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
Post-Bid
$45,000,000 to $55,000,000 est. value
Colorado Springs, CO 80914

Colorado Springs Airtanker Base
New Construction
Results
Colorado Springs, CO

Public Safety Complex CM/GC
Results
Montrose, CO

CyberWorx U.S. Air Force Academy, Colorado.
New Construction
Construction
Less than $35,000,000 est. value
Colorado Springs, CO

Sijan Hall Dormitory
Renovation - 700,000 SF
Pending Verification
CO 80840

Consolidated Space Operations Facility, Schriever AFB, Colorado
Design
$100,000,000 to $160,000,000 est. value
Colorado Springs, CO

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Integrated Project Delivery Method Utilizing Construction Management/General Contracting (CM/GC) Services
Results
Less than $8,000,000 est. value
Greenwood Village, CO 80112

Building Relocation Project
Post-Bid
Pagosa Springs, CO 81147

Reported 01/29/2020 12:00 AM
Project Title

Schriever AFB, CO-AMRS Metering Implementation

Physical Address View project details and contacts
City, State (County) CO   (El Paso County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Statement of Work (SOW) sets forth the requirements for a RE&C incidental design and construction effort at Schriever AFB, CO. The RE&C Contractor is to provide the government with a Work Breakdown Structure (WBS), Construction Work Plan (CWP), construction, and warranty for the Advanced Meter Reading System to meet the existing design and current Air Force Standards. The Contractor shall prepare the WBS and CWP for the implementation of an AMRS that incorporates meters, meter reading systems, and data management capabilities at Schriever AFB, CO in accordance with the Department of Energy (DOE), Federal Energy Management Program (FEMP) Guidance for Electric Metering in Federal Buildings, dated November 2014.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents