Similar Projects
Courage To Overcome
New Construction
Conception
Collinsville, VA 24078

Brightview Outpatient Substance Abuse Facility
New Construction, Renovation - 7,520 SF
Conception
Prince George, VA 23875

Courthouse Landing
New Construction - 480,000 SF
Design
$290,000,000 est. value
Chesterfield, VA 23832

Canterbury On The Bay
New Construction
Design
$25,000,000 est. value
Virginia Beach, VA

Aspen Dental
Build-Out - 3,500 SF
Post-Bid
Fredericksburg, VA 22406

Octapharma Plasma
Renovation - 12,882 SF
Post-Bid
$1,000,000 to $1,600,000 est. value
Richmond, VA 23294

Z2DZ--590-602 Renovate and Expand Domiciliary
Renovation
Results
$5,000,000 to $10,000,000 est. value
Hampton, VA 23667

Prince George Wellness Center Renovation Phase 1
Renovation
Results
Disputanta, VA 23842

Virginia Hospital Center Expansion
New Construction, Renovation, Addition - 260,000 SF
Construction
$250,000,000 to $300,000,000 est. value
Arlington, VA 22205

Danville MRI Renovation
Renovation - 1,056 SF
Construction
Danville, VA 24541

Inova Mount Vernon Hospital - Elevator Upgrade
Renovation
Pending Verification
Alexandria, VA

Ballad Health Expansion
Renovation, Addition
Pending Verification
$9,000,000 est. value
Big Stone Gap, VA 24219

Peninsula Health Center
Renovation
Conception
$4,100,000 est. value
Newport News, VA 23601

Fredericksburg VA Health Care Center
New Construction - 462,722 SF
Design
Fredericksburg, VA

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Last Updated 05/27/2022 12:13 PM
Project Title

Aspen Dental

Physical Address View project details and contacts
City, State (County) Waynesboro, VA 22980   (Waynesboro City County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method
Project Status Permitting, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Medical Office/Outpatient, 3,500 SF Build-Out.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents