Similar Projects
The Ballston Pond Retrofit Project
Bidding
$3,500,000 est. value
VA

Corrugated Metal Pipe
Bidding
Mouth of Wilson, VA 24363

Donaldson Stream Tributary Restoration
Post-Bid
Arlington, VA

Corrugated Metal Pipe and Bands
Results
Wise, VA 24293

Buena Vista Industrial Park Access Road and Utilities Phase I
Results
Buena Vista, VA 24416

Polymer Coated CM Pipe for Christiansburg AHQ
Results
Christiansburg, VA 24073

Micron Pond Improvements
Results
Manassas, VA 20110

On-Call Pipe Rehabilitation and Repair
Results
Less than $701,000 est. value

On-Call Emergency Soil Repair
Term Contract
Results

HDPE Pipe
Term Contract
Results
Gainesville, VA 20155

Burton Station/Baker Road Drainage Improvements
Results
Less than $1,731,362 est. value
Virginia Beach, VA 23456

Millbrook HS Redbud ES Campus Stormwater Management Improvements
Results
Winchester, VA 22603

Concrete Pipe and Wingwalls
Results
Dryden, VA 24243

Bayberry Subdivision Drainage Improvements - Phase 1
Results
Newport News, VA

Last Updated 05/08/2020 09:07 AM
Project Title

Chickahominy Riverfront Park Living Shoreline

Physical Address View project details and contacts
City, State (County) Williamsburg, VA   (James City County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Project consists of shoreline stabilization at four segments of the park shoreline along with riparian buffer and wetland plantings. The shoreline is characterized by nearly vertical, eroding banks ranging from approximately 3 to 15 feet in height broken up by localized areas of bank stability. The project proposes a living shoreline with rock marsh sills and beach nourishment on the west side of the park along the Chickahominy River and marsh creation and stabilization using rock marsh sills, submerged logs, marsh creation, and plantings for a portion of the Gordon Creek Shoreline to the north. A small area of the shoreline of Gordon Greek is proposed to be stabilized using a rock revetment. Locations where bald cypress trees are present along the toe of existing banks are preserved and expanded with marsh creation wherever feasible. A planting plan of native plants appropriate for their location has been developed and will be implemented throughout the project area. In addition, riparian plantings are proposed to convert 0.46 acres of existing managed turf to a forested condition and another 0.29 acres of understory enhancement to existing buffer areas.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents