Similar Projects
K-6 Conversion Renovations at Mozart High School
Renovation
Bidding
$660,000 est. value
Boston, MA 02131

Complete Demolition and Renovation of the Existing Fourth Floor Interior Office Walls and Constructing Two New Classrooms
New Construction, Renovation, Demolition
Bidding
$76,775 est. value
Boston, MA 02122

Josiah Quincy Upper School Swing Space Project - Filed Sub Bids
Post-Bid
$1,044,030 est. value
Boston, MA

Toilet Room Renovations and Repairs at Various Schools Phase 2 - General Bids
Post-Bid
Boston, MA

Mary Lyon 9-12 School - General Bids
Renovation
Results
$1,256,782 est. value
Boston, MA 02135

William McKinley K-12 School Project - General Bids
Renovation
Results
$1,996,050 est. value
Boston, MA 02116

Boston College High School - Phase 1
New Construction, Renovation
Pending Verification
$100,000,000 est. value
Boston, MA 02125

Boston College High School - Phase 2
New Construction, Renovation
Pending Verification
Boston, MA 02125

Toilet Room Renovations and Repairs at Various Schools Phase 2 - Filed Sub Bids
Post-Bid
$1,750,000 est. value
Boston, Dorchester, MA

William McKinley K-12 School Project - Filed Sub Bids
Renovation
Results
$2,513,926 est. value
Boston, MA 02116

Boston College High School - Phase 3
New Construction
Pending Verification
Boston, MA 02125

Roxbury Prep Washington Street Campus Alterations
Renovation
Post-Bid
$100,000 est. value
Boston, MA 02119

Mary Lyon 9-12 School - Filed Sub Bids
Renovation
Results
$1,256,782 est. value
Boston, Brighton, MA 02135

Locker Room Renovations at Brighton High School - Filed Sub Bids
Renovation
Post-Bid
$2,641,570 est. value
Boston, MA 02135

Boston Prep Wall Repair
Renovation
Results
$85,000 to $100,000 est. value
Boston, Hyde Park, MA 02136

Last Updated 06/01/2022 09:28 AM
Project Title

Locker Room Renovations at Brighton High School - General Bids

Physical Address View project details and contacts
City, State (County) Boston, MA 02135   (Suffolk County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,641,570
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The scope of work is further detailed in the specifications and includes locker room renovations at Brighton High School complete demolition and renovation of the existing boys and girls locker rooms.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents