Similar Projects
PBSO, District 6 - Chiller Replacement
Bidding
Lake Worth, FL 33467

WUD, WTP 3 - Exhaust Fans Replacement
Term Contract
Bidding
Delray Beach, FL 33446

Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

2019 Commercial Pool Cooler
Results
North Palm Beach, FL 33408

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

Hagen Ranch Road Library - Chiller Replacement
Results
Delray Beach, FL 33446

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project
Post-Bid
Pahokee, FL 33476

GCC - Air Handler Unit #11 Replacement
Term Contract
Results
West Palm Beach, FL 33401

Building 12 Animal Lab Renovation
Post-Bid
Boca Raton, FL 33431

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

Commercial Pool Cooler System
Post-Bid
North Palm Beach, FL 33408

MCCH - HVAC Replacement AHU #28
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

Last Updated 06/30/2020 11:11 AM
Project Title

Highridge Family Center - Chiller Replacement

Physical Address View project details and contacts
City, State (County) FL   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing two chillers, furnish and install two new, Trane 208VAC, 3Phase, 60HZ Air-cooled Scroll Packaged Chillers. Model# CGAM060A2 or PBC approved equal. See Exhibit “1”. Remove existing chillers and dispose of according to Section 5 of the Project Requirements. Re-attach the existing lightning protection system. Chillers and pumps to be replaced one at a time, so one chiller and pump can operate during construction. Replace existing water flow switches with same type or equal. Replace two closed coupled in line chilled water pumps (B&G series 90 or equivalent). Same design specs as existing equipment. Contractor to reconfigure chilled water piping to new chillers chilled water connections. Chilled water pipes shall be insulated in foam glass type insulation. Chilled water pipes to have aluminum jacketing where needed. Replace existing Taco CBX expansion tank (bladder type). Replace existing Bell & Gossett air separator. Replace Bell & Gossett A-545A flanged circuit setter. Replace check valve (wafer type), Danfoss Flowmatic 888 or approved equal. Replace existing Siemens disconnects with stainless steel all weather enclosures feeding chillers. Replace existing both Square D combination starter disconnect with new Square D combination starter disconnects with stainless steel all weather enclosures. Replace all EMT conduit and liquid tight to chiller components and pumps. Replace all fittings with water tight type.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.
Division 26 - Electrical, Facility Lightning Protection.
Division 33 - Utilities, Site Grounding, Site Lightning Protection.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents