Similar Projects
WWTF Valve Upgrades
Renovation
Bidding
Lake Nebagamon, WI

WWTF Renovation
Renovation
Bidding
Hatley, WI 54440

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

Osmosis Plant at the Calumet County Park
New Construction
Bidding
Hilbert, WI 54129

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

Digester Cover Rehabilitation Project
Renovation
Post-Bid
Less than $300,000 est. value
Waupaca, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Operations Building Elevator Modernization
Renovation
Post-Bid
$100,000 est. value
Madison, WI 53713

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

Last Updated 09/09/2021 02:10 PM
Project Title

Cluster System Expansion

Physical Address View project details and contacts
City, State (County) Lake Hallie, WI   (Chippewa County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a wastewater cluster system including Aerobic Treatment Units(ATUs), process piping, pumps,drain fields and associated electrical and site work.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents