Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

FY21 SOF Combat Aircraft Parking Apron - North, Hurlburt Field, Florida
Term Contract
Bidding
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL

Runway 4-22 Rehabilitation/Reconstruction and Wetlands Mitigation Phase 2
Infrastructure
Bidding
$16,000,000 est. value
Punta Gorda, FL 33982

Homestead ARB BAK 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Apron/Main Ramp Rehabilitation Construction (210221)
Infrastructure
Bidding
$2,300,000 to $2,800,000 est. value
Leesburg, FL 34788

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Pavement Rehabilitation
Infrastructure
Bidding
Tampa, FL 33607

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Remove, Re-Grade, and Install New Rubberized Surface Material Under Static Aircraft Mounds.
Post-Bid
Panama City, FL 32403

Runway 5-23 and Apron Rehabilitation George T Lewis Airport
Results
Cedar Key, FL 32625

Last Updated 07/27/2021 10:43 AM
Project Title

Taxiway A Extension and Mitigation, Key West International Airport

Physical Address View project details and contacts
City, State (County) Key West, FL 33040   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Geometry correction for Taxiway A2 and Construction of Taxiway A1. Shift of the impacted airfield service road outside of Taxiway A’s object free area. Mitigation of the impacted airfield wetlands The TWY A extension and subsequent impacted airfield elements will require electrical modifications to accommodate for the new geometries, including RWY 09 REIL rack relocation, as well as drainage adjustments to address change in grades and the addition of impervious surfaces.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents