Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Gateway Tower
New Construction - 300,000 SF
Conception
$64,000,000 est. value
San Jose, CA 95113

Casa Roseland
New Construction
Design
Santa Rosa, CA 95405

Moffett Road / Multi-Residential
New Construction, Infrastructure - 24,500 SF
Design
$10,900,000 CJ est. value
Ceres, CA 95307

Sunrise Mall Redevelopment Phase 3
New Construction
Conception
Citrus Heights, CA 95610

Clearwater at Windsor
New Construction, Infrastructure - 26,750 SF
Design
$74,000,000 CJ est. value
Windsor, CA 95492

Theory Sacramento Apartments
New Construction
Conception
Sacramento, CA 95819

Marina Village Housing Project
New Construction
Design
Suisun City, CA 94585

Terracina at Whitney Ranch
New Construction
Conception
$88,000,000 est. value
Rocklin, CA

PierPont Mixed-Use Development
New Construction - 133,215 SF
Design
Ventura, CA 93001

Sienna Pointe and Heackock Park Apartment Complexes Renovation
Renovation
Conception
$10,000,000 est. value
Moreno Valley, CA 92553

Redwood Glen Housing
New Construction
Design
Windsor, CA 95492

Placer Ranch
New Construction - 5,000,000 SF
Conception
$100,000,000 est. value
Roseville, CA

Mill Creek Mixed Use Development
New Construction - 34,270 SF
Design
$178,000,000 est. value
Visalia, CA 93291

Alta Cuvee Mixed Use Development
New Construction, Build-Out - 84,839 SF
Conception
$10,000,000 est. value
Rancho Cucamonga, CA 91739

Last Updated 01/24/2023 11:35 AM
Project Title

North Creek Crossings - Phase II - 66004 - City of Chico

Physical Address View project details and contacts
City, State (County) Chico, CA 95928   (Butte County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,971,523 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Funds set-aside to assist a new affordable multi-family project. Estimate 60 units, details TBD. Capital project overhead is not charged to this project. As of January 23, 2023, construction is underway and slated to be completed in January, 2024, however, an exact timeline for construction has not been confirmed. No further inquiries to be accepted. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents