Similar Projects
HVAC Upgrade Adair Youth Development Center Department for Juvenile Justice
Renovation
Sub-Bidding
$479,250 CJ est. value
Columbia, KY 42728

Athletic Complex Bid Package 1: Lincoln Elementary Cooling Tower Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Dayton, KY 41074

Middle-High School HVAC Upgrades in Main and Auxiliary Gyms
Alteration
Post-Bid
Beattyville, KY 41311

HVAC and Mechanical Services
Term Contract
Post-Bid
Louisville, KY

HVAC Install at Carr Creek Lake
Term Contract
Results
Sassafras, KY 41759

Restore AHU-10 System or S 5-7
Term Contract
Results
$500,000 to $1,000,000 est. value
Louisville, KY 40206

Lafferty Hall/Fine Arts Guignol Building HVAC
Renovation - 22,176 SF
Construction
$6,100,000 CJ est. value
Lexington, KY 40508

Turnkey Replacement of an Existing Rooftop Air Handling Unit and Hot Water Boilers
Renovation
Sub-Bidding
$170,000 CJ est. value
Munfordville, KY 42765

Gas Meter Replacement
Renovation
Post-Bid
$60,000 CJ est. value
Ashland, KY 41101

Blue Grass Airport - Boiler Room 1 - Chiller Replacement - 2112
Alteration
Results
$275,000 est. value
Lexington, KY

Housing Authority of Vanceburg - HVAC Upgrades
Renovation
Sub-Bidding
$200,000 CJ est. value
Vanceburg, KY 41179

Woodland Elementary School HVAC Renovation
Renovation
Post-Bid
$2,000,000 CJ est. value
Radcliff, KY 40160

College of Education IAQ Improvements
Alteration
Results
Louisville, KY

HVAC Replacement at City Hall
Renovation
Sub-Bidding
$225,000 CJ est. value
Owensboro, KY 42303

ARP Esser-Phase 1 Laurel Elementary School HVAC/Roof Replacement Project
Alteration
Post-Bid
$200,000 est. value
Vanceburg, KY 41179

Last Updated 09/18/2023 11:17 AM
Project Title

Central Lab Chillers Installation

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $720,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The Central Lab Central Utility Plant building houses the chilled water and steam production for the Commonwealth of Kentucky, Centralized Labs. This project consists of the installation of two Owner Furnished / Contractor Installed, 875-ton centrifugal chillers. Additionally, the project includes replacing three of the Chilled Water System pumps, relocation of condenser water piping and adding a modified chilled water decoupling slip loop, controls and replacement electrical power wiring and conduit. Due to the placement of the machines and the desire to facilitate better servicing conditions, the project also includes certain architectural modifications, including adding two exterior overhead service doors and associated modifications to panel walls. The addition of exterior service pads for each door is also a requirement. The main natural gas entrance to the building must also be relocated to accommodate chiller removal. Since this is a critical operating facility, the work must be implemented in phases to provide continued cooling capabilities to the Labs. Responsible Contractors who have proper experience, equipment and qualifications are invited to bid on this work. These factors will be considered in the Award of Contract and all work will be performed under the standard regulations for construction of the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. For any COVID information refer to the Team Kentucky website. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents