Similar Projects
Pump And Well For Florence Sports Complex
Bidding
Florence, SC

Effluent Pumps Rehabilitation Project
Post-Bid
SC

Well Pump Replacement
Post-Bid
Saint George, SC 29455

Irrigation Well/Pump Repair/Replacement
Results
Florence, SC

Mable T. Willis Boulevard Well
Results
Walterboro, SC 29488

Provide and Install Two New Fiberglass Sewer Tanks and Grinding Pumps at Charleston County K-9 Facility
Post-Bid
North Charleston, SC 29405

Replace Existing 35 Year-Old Potable Well at Waddell Mariculture Center
Results
Bowman, SC

New Well No. 4 and Raw Water Main for Water Plant No. 5
Post-Bid
Sumter, SC 29150

Buck Hall Well Construction
Results
Less than $25,000 est. value
McClellanville, SC 29458

Schwartz Wastewater Treatment Plant Philly RAS Pumps
Post-Bid
Conway, SC 29528

CWS Hanahan Water Treatment Plant Pump and Motor
Results
Less than $217,761 est. value
Charleston, SC 29402

Installation of Residential Wells (18 Sites)
Post-Bid
Adams Run, Edisto Island, McClellanville, Ravenel, Wadmalaw Island, SC 29449

Well Drilling Services for the Construction of a Monitoring Well at Donnelly WMA
Results
Less than $27,555 est. value
Green Pond, SC 29446

Midtown Sewer Improvements
Post-Bid
Shell Point, SC

Replace Existing Well Pump and Motor at Loris High School
Results
Loris, SC 29569

Last Updated 01/06/2020 04:01 PM
Project Title

Well Drilling Services for the Construction of a Well at Samworth WMA

Physical Address View project details and contacts
City, State (County) Georgetown, SC 29440   (Georgetown County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $29,014
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installing a new well on the following property: Samworth WMA located at 420 Dirleton Rd. Georgetown, SC 29440. The office, technician house, and agricultural shed/shop all currently share a common well. We desire a new 4" well to be installed and used in the same manner due to frequent loss of pressure and other issues associated with existing well. This well will have the capability of providing adequate water to the office, technician trailer, and the shop/shed (filling 200-300 gallon sprayer tanks). All new components will be housed in the existing pump house where current well is located minus the well head. New well head will be covered (lumber constructed well house or pho-rock cover) and insulated adequately. New well will be connected to piping at old well. Old well will be kept in place and functional to use as emergency or additional water source.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents