Similar Projects
Grading, Interim Surfacing
Infrastructure
Conception
$20,549,000 CJ est. value
Clear Lake, SD 57226

Grading, Interim Surfacing
Infrastructure
Conception
$20,549,000 CJ est. value
Clear Lake, SD 57226

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cold Milling Asphalt Concrete Asphalt Concrete Resurfacing 26K Ton, Pipe Work, Modify Intersection
Infrastructure
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Concrete Surfacing
Infrastructure
Results

Grading, Interim Surfacing, Replace Str RCBC, Approach Slab
Demolition, New Construction, Infrastructure
Conception
$13,842,000 CJ est. value
Toronto, SD 57268

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Bridge Deck Sweeping in the Watertown Area
Infrastructure
Results
Watertown, SD

AC Surfacing - SD 15
Infrastructure
Conception
$6,533,000 CJ est. value
Clear Lake, SD 57226

Road Repair, Blading, Snow Removal
Term Contract, Infrastructure
Post-Bid
Astoria, SD

Rout and Seal
Infrastructure
Results

AC Surfacing, Mill, AC Resurfacing - SD 28
Infrastructure
Conception
$11,390,000 CJ est. value
Toronto, SD 57268

Asphalt Paving 7th Avenue and Curb Line Paving
Infrastructure
Results
Clear Lake, SD

AC Resurface Murdo Maintenance Yard, Chip Seal, and Fog Seal
Infrastructure
Results
$5,000,000 est. value
Clear Lake, SD

Last Updated 01/24/2023 06:40 AM
Project Title

Urban Grading, AC Surfacing, Curb and Gutter, Sidewalk, Lighting - SD 28

Physical Address View project details and contacts
City, State (County) Toronto, SD 57268   (Deuel County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $3,804,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD28 - Through Toronto Length 0.5 As of January 24, 2023, the project is in Conceptual status. Anticipated Construction year is 2026. SDDOT - Urban Grading, AC Surfacing, Curb and Gutter, Sidewalk, Lighting - SD 28 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents