Similar Projects
4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pipe Purchase for Kannah Creek Flowline Replacement
Results
$150,000 to $200,000 est. value
Grand Junction, CO 81501

22 Road Waterline Replacement
Results
Less than $375,756 est. value
Grand Junction, CO 81501

Smallwood Drive 10 Inch Main Line Upgrade
Results
Clifton, CO 81520

2020 Waterline Replacement Project
Results
Grand Junction, CO

Loma Linda Subdivision 8 Inch Waterline Replacement Project
Results
Less than $410,108 est. value
Grand Junction, CO 81501

2020 Juniata Reservoir Outlet Valve Replacement Purchase
Results
Grand Junction, CO

12-Inch Waterline Extension Project (I Road to Brookfield Subdivsion)
Results
Less than $109,816 est. value
Grand Junction, CO 81505

Bower Avenue Sewer and Water Line Replacements
Results
$300,000 to $350,000 est. value
Palisade, CO 81526

18 1/2 Road 8 Inch Waterline Extension Project
Results
Less than $102,512 est. value
Grand Junction, CO 81501

ML 47 Improvement Project
Construction
$730,000 est. value
Clifton, CO 81520

Northside Transmission Main Valve Replacement Project
Results
Less than $464,375 est. value
Grand Junction, CO 81505

27 inch Transmission Line Upgrade Project
Post-Bid
Clifton, CO

Loma Area 8 Inch Waterline Upgrade Project
Results
Grand Junction, CO

Dowd Junction Service Line Replacement
Post-Bid
$400,000 est. value
Grand Junction, CO 81504

Reported 06/02/2021 06:17 PM
Project Title

2021 Purdy Mesa Flowline Replacement

Physical Address View project details and contacts
City, State (County) Grand Junction, CO   (Mesa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the installation of approximately 32,600 LF of 20” C900 PVC DR-18 water line, 6” air valves and one 6” drain assembly. Existing flowline must remain in operation during constructionof new pipeline until such time as connection to replacement pipe is prepared.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents