Similar Projects
Stonefield Terrace Phase 2 Public Improvements
Bidding
$260,000 est. value
Madison, WI 53717

2021 Street Pulverization
Bidding
Stoughton, WI

Parking Lots, Curbs, and Exterior Lighting - General
Post-Bid
$570,000 est. value
Madison, WI 53718

Village of Dane Southeast Public Works Loop
Post-Bid
Dane, WI

Boardwalk Replacement
Results
De Forest, WI 53532

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Annual Horizontal Sawcutting District 13
Post-Bid
$119,000 est. value
Madison, WI

Sandhill Elementary School Pavement Restoration - Parking Lot and Playground Service Drive
Results
Stoughton, WI 53589

North Bird Street Concrete Pavement, West Main Street Pedestrian Improvements and Museum Sidewalk
Post-Bid
Sun Prairie, WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

Annual Horizontal Sawcutting District 14
Post-Bid
$92,000 est. value
Madison, WI

Hubbard Avenue, Mayflower Drive, Violet Place, Orchid Lane Reconstruction
Results
Less than $2,472,200 est. value
Middleton, WI 53562

Parking Lots, Curbs, and Exterior Lighting - MEP
Results
$570,000 est. value
Madison, WI 53718

2021 CTH MN/Broadhead Street Utility and Street Improvements
Results
McFarland, WI 53558

Resurfacing 2021 - Curb, Gutter and Castings
Results
$900,000 est. value
Madison, WI 53787

Last Updated 01/13/2021 11:57 PM
Project Title

Spring Green - Madison, Walter Road

Physical Address View project details and contacts
City, State (County) WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

USH 14; 0.797 Miles; Excavation, Base, HMA Pavement, Concrete Pavement, Curb and Gutter, Sidewalk, Signs, Beam Guard, Pavement Marking, Traffic Signals, Street Lighting, and Storm Sewer. Excavation Common, 27,121 CY; Borrow, 489 CY; Base Aggregate Dense, 38,626 Ton; Concrete Pavement, 73 SY; Marking Epoxy, 18,963 LF; Construction Staking, 52,885 LF; Construction Staking, 146 Each; Construction Staking, 2 LS; Culvert Pipe, 154 LF 18”; Storm Sewer Pipe Reinforced Concrete, 1,078 LF 12“, 282 LF 15“, 517 LF 18“, 1,895 LF 24“, 898 LF 30“; Concrete Curb and Gutter, 7,353 LF; Concrete Sidewalk, 24,794 SF; Beam Guard, 531 LF; Beam Guard Energy Absorbing Terminals, 2 Each; HMA Pavement, 7,334 Ton; Removing Asphaltic Surface Milling, 1,280 SY; Tack Coat, 2,463 Gals; Signs, 357 SF; Storm Sewer Rock Excavation, 500 CY; Conduit Rigid Nonmetallic Schedule 40 2-inch, 4,184 LF.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents