Project Title | Concrete Pad and Hydronic Tubing Replacement Services |
Physical Address | View project details and contacts |
City, State (County) | Truckee, CA 96161 (Nevada County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $137,214 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall provide all labor, tools, equipment, materials, overhead, travels, and incidentals necessary to perform demolition, removal, disposal, and installation of the wash rack concrete pad and hydronic tubing at the District 03 Truckee Maintenance Station (MS) Equipment Sub-Shop The total bid proposal for this Agreement must not exceed $388,000.00. A bid proposal over $388,000.00 will be deemed non-responsive and will be rejected. As required by Executive Order S-02-06, the California Department of Transportation (Caltrans) is committed to meeting the States 25 percent (25%) Small Business (SB) participation goal. Certified SBs, Micro Businesses (MB), SBs for the purpose of Public Works (SB-PW), and contractors willing to commit to subcontracting a minimum of twenty-five percent (25%) of their net bid price to certified SBs, MBs (if applicable), or SB-PWs, are encouraged to submit bids Written Question Submittal 05/16/2022 - Email: esmeralda.rojo@dot.ca.gov This Agreement requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. In the event a potential prime contractor is unable to attend the Optional Site Inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential prime contractor at a Site Inspection Payment Bond Requirement: If the total contract price exceeds $25,000, Contractor shall furnish a Payment Bond for not less than one hundred percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate Contractor obligations under this Agreement. Proposed Award Date (estimate) 05/23/2022 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |