Similar Projects
Pavement Improvement
Infrastructure
Bidding
$7,500,000 CJ est. value
Qulin, MO 63961

Pavement Improvement
Infrastructure
Bidding
$7,500,000 CJ est. value
Qulin, MO 63961

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

New Hope Assisted Living / Poplar Bluff
New Construction, Infrastructure
Pending Verification
$976,000 CJ est. value
Poplar Bluff, MO 63901

True Manufacturing / Popular Bluff
Addition, New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Poplar Bluff, MO 63901

Resurface, Shoulder Improvement
Infrastructure
Bidding
$10,000,000 CJ est. value
Poplar Bluff, MO 63901

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Williamsville Street and Drainage
Infrastructure
Post-Bid
$150,000 CJ est. value
Poplar Bluff, MO 63901

Poplar Bluff Industrial Park Infrastructure Improvements
Infrastructure
Results
$1,000,000 est. value
Poplar Bluff, MO 63901

Last Updated 09/20/2022 01:32 AM
Project Title

Pavement Improvements

Physical Address View project details and contacts
City, State (County) Poplar Bluff, MO 63901   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,245,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J9P3514 Route 67 BUTLER County. Pavement improvements south of Route 160 to Arkansas state line, the total length of improvement being 10.951 miles. Range: $1M - $2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - H01 - Pavement Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents